Low-carbon Steel for Data Centres Market (2026-2036)
The global Low-carbon Steel for Data Centres Market was valued at USD 3,280.0 million in 2025. This market is expected to reach USD 21,500.0 million by 2036 from an estimated USD 3,960.0 million in 2026, registering a CAGR of 18.4% during the forecast period (2026-2036).
- Published
- Oct 2026
- Pages
- 367
- Format
- PDF + Excel
- Report ID
- MRCHM - 1042409
- Base year
- 2025
- 2025 · BASELINE
- $3.28B
- 2036
- $21.50B
- CAGR 2026–2036
- 18.4%
2025 baseline · 2026–2036 forecast at 18.4% CAGR · hover a bar for the value
Key highlights
The global Low-carbon Steel for Data Centres Market is valued at USD 3, 960.0 million in 2026 and is projected to reach USD 21,500.0 million by 2036, at a CAGR of 18.4%.
Based on production route, the scrap-based EAF segment is expected to account for the largest share of the market in 2026, while the hydrogen-based DRI-EAF segment is projected to register the highest CAGR during the forecast period.
Based on product form, the structural sections and plate segment is expected to account for the largest share of the market in 2026, while the galvanized and coated flat products segment is projected to register the highest CAGR during the forecast period.
Based on emissions intensity tier, the reduced-intensity tier segment is expected to account for the largest share of the market in 2026, while the near-zero tier segment is projected to register the highest CAGR during the forecast period.
Based on certification route, the product-level EPD segment is expected to account for the largest share of the market in 2026, while the mass-balance and book-and-claim allocation segment is projected to register the highest CAGR during the forecast period.
Based on application, the structural frame and foundations segment is expected to account for the largest share of the market in 2026, while the electrical and mechanical support steel segment is projected to register the highest CAGR during the forecast period.
Based on data centre type, the hyperscale segment is expected to account for the largest share of the market in 2026, while the colocation segment is projected to register the highest CAGR during the forecast period.
Based on geography, Europe is expected to account for the largest share of the market in 2026, while North America is projected to register the highest CAGR during the forecast period.
Report summary
| Particulars | Details |
|---|---|
| Base Year | 2025 |
| Estimated Year | 2026 |
| Forecast Period | 2026-2036 |
| Market Size in 2025 | USD 3,280.0 million |
| Market Size in 2026 | USD 3,960.0 million |
| Market Size by 2036 | USD 21,500.0 million |
| CAGR (2026-2036) | 18.4% |
| Format | PDF, Excel & Cloud Portal · 367 pages |
| Largest Segment by Production Route (2026) | Scrap-Based EAF |
| Fastest-growing Segment by Production Route | Hydrogen-Based DRI-EAF |
| Largest Region (2026) | Europe |
| Fastest-growing Region | North America |
| Segments Covered | Production Route, Product Form, Emissions Intensity Tier, Certification Route, Application, Data Centre Type, Geography |
| Number of Companies Profiled | 18 |
Report overview
Segments covered: production route, product form, emissions intensity tier, certification route, application.
The growth of this market is driven by the arrival of mandatory life-cycle carbon disclosure for new buildings in the European Union, the start of the definitive phase of the Carbon Border Adjustment Mechanism, and the embodied carbon commitments that large data centre operators have attached to their construction programmes. Steel is the single largest contributor to the embodied carbon of a data centre shell, which makes the production route of that steel the first variable a designer can change without altering the building.
Growth in this market is nevertheless a penetration story rather than a volume story. The tonnage of steel consumed by data centre construction grows with floor area, but the share of that tonnage which qualifies as low-carbon grows far faster, because it is being pulled by regulation that lands inside the forecast period rather than by voluntary preference. The constraint sits on the supply side. Announced hydrogen-based capacity has been delayed and in several cases withdrawn, which means the low-carbon steel a data centre can actually buy before 2030 is overwhelmingly scrap-based electric arc furnace material rather than the hydrogen steel that procurement commitments were written against. The market therefore grows quickly while remaining tightly rationed, and value accrues to producers able to document what they already make rather than to those able to describe what they intend to build.
Low-carbon steel for data centres is not a different material. It is the same structural sections, plate, coil, rebar and coated flat product used in any data centre, made by a production route with lower emissions per tonne and sold with documentation that evidences the difference. The product is defined by its paperwork and its process, not by its mechanical properties, which is why the market behaves unlike any other steel category. A buyer cannot inspect the attribute, cannot test for it on delivery, and cannot substitute between suppliers without revalidating the claim, so trust in the certification route carries commercial weight that would be absurd in ordinary steel trading.
Steel matters in a data centre because of where it sits in the carbon account. Operational emissions have been attacked for a decade through power purchase agreements, efficiency and siting, and in facilities running on contracted renewable supply the embodied carbon of the building becomes the larger remaining number. Within that embodied total, the structural frame, foundations, decking, support steel and reinforcement dominate, and steel dominates them. An operator that has already decarbonised its electricity has nothing left to work on but the shell, and the shell is mostly steel and concrete. That is the demand logic, and it is why data centre operators appear among the most active buyers of low-carbon steel despite being a small share of global steel consumption.
What has changed since 2025 is that this logic has acquired a legal deadline. Under Directive (EU) 2024/1275 on the energy performance of buildings, the life-cycle global warming potential of a new building must be calculated and disclosed in its energy performance certificate from 1 January 2028 for new buildings above 1,000 square metres of floor area, and from 1 January 2030 for all new buildings. The calculation covers the full emissions chain, including materials production and transport, on-site construction, operational energy, maintenance, demolition and end-of-life waste handling with reuse and recycling. Every new data centre in the European Union sits well above the one thousand square metre threshold, which means that from 1 January 2028 the embodied carbon of the steel frame appears on a document the building is required to hold. The common calculation method was set by Delegated Regulation (EU) 2026/52, which the European Commission adopted on 16 December 2025, which was published in the Official Journal on 4 May 2026 and entered into force on 24 May 2026 following the two-month scrutiny period by the Council and the Parliament. The regulation amends and replaces Annex III to the Directive, allows Member States a measure of national flexibility, aligns with the Construction Products Regulation and with the Ecodesign and energy labelling rules, encourages low-carbon and circular materials, and permits default values where product-specific data is missing. The practical consequence is that a design decision which was previously discretionary becomes a disclosed figure subject to a common method, and a number that must be disclosed is a number that gets managed.
On the import side the cost of high-intensity steel is being set separately. Regulation (EU) 2023/956, which established the Carbon Border Adjustment Mechanism, was adopted on 10 May 2023 and began to apply from 1 October 2023. The transitional phase imposed reporting duties only, and the definitive period starts on 1 January 2026, when importers must pay for certificates covering the embedded emissions of covered goods. Iron and steel is one of the six sectors in scope, alongside aluminium, fertilisers, cement, hydrogen and electricity, and the covered products are listed by CN code in the annexes to the regulation. Importers must register as CBAM declarants through the CBAM registry, must hold certificates covering at least 80 percent of the embedded emissions of goods imported since the start of the year at each quarter end, and must report and surrender certificates annually by 31 May. A proposed amending regulation would move the surrender date to 31 August, defer the 2026 purchase obligation so that the platform begins selling certificates from February 2027, and reduce the quarterly holding ratio to 50 percent. Free allowances under the European Union Emissions Trading System are accounted for in the calculation, and the CBAM cost rises through the CBAM factor as those allowances are withdrawn. For a European data centre project, CBAM and the life-cycle disclosure requirement act on the same material from different directions. CBAM prices the embedded emissions of imported steel at the border, while the Directive requires the embodied carbon of the finished building to be calculated and published. A supplier who can satisfy both with one data set holds an advantage that neither regime creates on its own.
The difficulty is that demand created by regulation has run ahead of supply created by investment. In June 2025, ArcelorMittal suspended planned investments of EUR 1.3 billion in direct reduced iron and electric arc furnace capacity intended to decarbonise its German steelmaking at Bremen and Eisenhuettenstadt, where the technology was to replace blast furnaces and where construction had been scheduled to begin by that month. The company stated that the business case for proceeding was not strong enough even with financial support from the German federal government, the state of Bremen and the state of Brandenburg, citing weak European steel demand, high levels of steel imports, high German electricity prices, delays in green hydrogen and the weak competitiveness of gas-based direct reduction, and said it was unlikely to meet its 2030 carbon emissions target. That decision is the clearest available indication of the gap between announced and buildable capacity, and it is not isolated. The economics of hydrogen-based direct reduction depend on cheap firm low-carbon electricity and on hydrogen at prices that have not materialised, and where those inputs are expensive the route does not clear its cost of capital even with public support. The consequence for a data centre buyer is concrete: a procurement commitment written against near-zero steel must in practice be met for most of this decade with scrap-based electric arc furnace material, which is genuinely lower in intensity than blast furnace steel but is not near-zero and is limited by the availability of scrap.
Scrap is therefore the quiet constraint on the whole market. Electric arc furnace steelmaking is as low-carbon as its charge and its electricity allow, and both are finite. High-quality scrap suitable for structural sections competes with every other EAF user, and in regions where the existing fleet is already largely electric the marginal tonne of low-carbon steel is harder to find than in regions converting from blast furnaces. This produces the counter-intuitive result that the regions with the cleanest steel industries have the least headroom to supply additional low-carbon tonnes, while the regions with the dirtiest have the most potential improvement and the least near-term availability.
Allocation accounting has grown into the space between the two. Where physical near-zero tonnes are scarce, mass-balance and book-and-claim methods allow a mill to assign a low-carbon attribute to a volume of conventional output, so that a buyer receives a certificate rather than a physically distinct tonne. These methods are widely used, are recognised in several standards, and are the fastest-growing certification route in this market precisely because physical supply is short. They are also contested, because the relationship between the certificate a data centre holds and the emissions actually avoided depends entirely on the integrity of the allocation rules. Any buyer relying on this route should expect the rules to tighten during the forecast period.
Competition reflects these conditions rather than conventional steel rivalry. Electric arc furnace producers with long-standing scrap-based operations can supply reduced-intensity steel today at modest premiums and compete on availability and documentation quality. Integrated producers converting to direct reduction are selling future capacity against present commitments and compete on credibility, which is now harder to establish after a sequence of deferred projects. A small number of new-build hydrogen-based producers compete on the strength of the attribute itself, with limited volume and premium pricing. Data centre operators buying across several regions encounter all three in the same tender, and the comparison between them is not a price comparison.
Market dynamics
22 factors across 5 forcesMandatory Life-Cycle Carbon Disclosure for New Buildings is Driving Demand for Documented Low-Carbon Steel
The arrival of mandatory life-cycle carbon disclosure is a major factor driving the Low-carbon Steel for Data Centres Market, because it converts embodied carbon from a voluntary reporting metric into a required figure calculated by a prescribed method. Under Directive (EU) 2024/1275 on the energy performance of buildings, the life-cycle global warming potential of a new building must be calculated and disclosed in its energy performance certificate from 1 January 2028 for new buildings above 1,000 square metres of floor area, and from 1 January 2030 for all new buildings. The calculation covers the full emissions chain, including materials production and transport, on-site construction, operational energy, maintenance, demolition and end-of-life waste handling with reuse and recycling The common calculation method was set by Delegated Regulation (EU) 2026/52, which the European Commission adopted on 16 December 2025, which was published in the Official Journal on 4 May 2026 and entered into force on 24 May 2026 following the two-month scrutiny period by the Council and the Parliament. The regulation amends and replaces Annex III to the Directive, allows Member States a measure of national flexibility, aligns with the Construction Products Regulation and with the Ecodesign and energy labelling rules, encourages low-carbon and circular materials, and permits default values where product-specific data is missing. Since every new European data centre exceeds the floor area threshold, the 2028 date applies to the whole of the sector pipeline currently in design, and the steel specification is the largest single lever available to reduce the disclosed figure. The effect is to pull low-carbon steel procurement forward into projects being designed now, well ahead of the compliance date, because design freeze precedes construction by years.
Embodied Carbon Dominates the Remaining Footprint of Facilities Running on Contracted Renewable Power
The decarbonisation of data centre electricity is driving demand for low-carbon steel, because it has shifted the composition of the remaining footprint. An operator supplying a facility from contracted renewable generation has already addressed the emissions that dominated its account, leaving the embodied carbon of the building as the larger residual, and within that residual the structural frame, foundations, decking and support steel are the principal contributors. The consequence is that steel specification has moved from the engineering margins to the centre of corporate carbon planning for this sector, and operators with public net-zero commitments have no credible route to them that leaves the steel decision untouched.
Carbon Border Pricing is Raising the Landed Cost of High-Intensity Steel in European Projects
Carbon border pricing is driving substitution towards lower-intensity material, because it attaches a cost to embedded emissions at the point of import. Regulation (EU) 2023/956, which established the Carbon Border Adjustment Mechanism, was adopted on 10 May 2023 and began to apply from 1 October 2023. The transitional phase imposed reporting duties only, and the definitive period starts on 1 January 2026, when importers must pay for certificates covering the embedded emissions of covered goods. Iron and steel is one of the six sectors in scope, alongside aluminium, fertilisers, cement, hydrogen and electricity, and the covered products are listed by CN code in the annexes to the regulation. Importers must register as CBAM declarants through the CBAM registry, must hold certificates covering at least 80 percent of the embedded emissions of goods imported since the start of the year at each quarter end, and must report and surrender certificates annually by 31 May. A proposed amending regulation would move the surrender date to 31 August, defer the 2026 purchase obligation so that the platform begins selling certificates from February 2027, and reduce the quarterly holding ratio to 50 percent. Free allowances under the European Union Emissions Trading System are accounted for in the calculation, and the CBAM cost rises through the CBAM factor as those allowances are withdrawn. For a project buying imported sections, plate or coated flat product, the certificate cost scales with the carbon intensity of the originating mill, which separates suppliers on a basis that specification language never captured. As free allowances are withdrawn and the CBAM factor rises, the gap between a high-intensity and a low-intensity tonne widens on landed cost alone, independent of any premium the buyer pays for the attribute.
Operator Procurement Commitments are Creating Contracted Demand Ahead of Available Supply
Published procurement commitments from large operators are driving demand because they create contracted offtake for low-carbon steel before the capacity to supply it exists. Commitments of this kind are attractive to producers planning conversion, since they reduce demand risk on an investment whose returns are otherwise uncertain, and they are the principal mechanism by which data centre construction influences steelmaking investment at all given its modest share of global consumption. The effect on the market is to concentrate early volume on a small number of qualified suppliers and to establish premium reference pricing that later entrants negotiate against.
Table of contents
14 chapters · 126 sections · 367 pages · click to expandGeographic analysis
Europe
Largest shareIn 2026, Europe is expected to account for the largest share of the market. The large share of this region is mainly due to the regulatory position rather than to construction volume. Under Directive (EU) 2024/1275 on the energy performance of buildings, the life-cycle global warming potential of a new building must be calculated and disclosed in its energy performance certificate from 1 January 2028 for new buildings above 1,000 square metres of floor area, and from 1 January 2030 for all new buildings. The calculation covers the full emissions chain, including materials production and transport, on-site construction, operational energy, maintenance, demolition and end-of-life waste handling with reuse and recycling. The common calculation method was set by Delegated Regulation (EU) 2026/52, which the European Commission adopted on 16 December 2025, which was published in the Official Journal on 4 May 2026 and entered into force on 24 May 2026 following the two-month scrutiny period by the Council and the Parliament. The regulation amends and replaces Annex III to the Directive, allows Member States a measure of national flexibility, aligns with the Construction Products Regulation and with the Ecodesign and energy labelling rules, encourages low-carbon and circular materials, and permits default values where product-specific data is missing. Alongside this, the definitive CBAM period starting on 1 January 2026 places a certificate cost on the embedded emissions of imported steel, and the combination gives European projects both a disclosure obligation and a landed-cost reason to buy lower-intensity material. The region also hosts most of the operating and planned low-carbon capacity in structural products.
North America
Fastest growthHowever, North America is projected to register the highest CAGR during the forecast period. The rapid growth of this region is attributed to the concentration of committed artificial intelligence campus construction in the United States, the predominance of electric arc furnace steelmaking in the domestic fleet, which makes documented reduced-intensity material readily available, and the embodied carbon commitments of the operators building that capacity. Growth is driven by voluntary procurement and by the scale of the construction pipeline rather than by a disclosure mandate, which makes the regional trajectory more sensitive to corporate commitment than to legislation.
Asia-Pacific
Asia-Pacific occupies a different position, with the largest steel industry, the largest construction volume and the smallest qualifying share. The regional fleet remains heavily weighted towards blast furnace production, which places most output outside the low-carbon tiers and limits the material a project can buy regionally even where demand exists. The region nevertheless holds the greatest absolute potential for reduction, and exporters serving European projects face CBAM certificate costs scaled to their embedded emissions, which creates a commercial reason to document and reduce intensity that is external to domestic policy.
Competitive landscape
The competitive landscape of the Low-carbon Steel for Data Centres Market is unusual because suppliers are not competing on the same basis. Established electric arc furnace producers compete on present availability and documentation quality, offering reduced-intensity material at modest premiums with product-level declarations that designers can place directly into a building calculation. Integrated producers converting to direct reduction compete on credibility, selling future capacity against present commitments, and that credibility has become harder to establish following a sequence of deferred and withdrawn projects. A small group of new-build producers compete on the attribute itself, with limited volume, near-zero intensity and premium pricing. These three propositions meet in the same tender, and the comparison between them is not primarily about price.
Competitive advantage is accruing to the parties who can evidence a figure rather than describe a route. A producer able to supply a verified product-level intensity for material deliverable this year is positioned for the shift in buyer emphasis from near-zero ambition towards present availability, while a producer whose position rests on announced conversion carries the risk that buyers will discount announcements. The same logic weakens intermediaries, because passing a verified figure from mill to project requires traceability that steel distribution has not historically maintained, and it strengthens fabricators and manufacturers who control their own bill of materials.
Key players operating in the global Low-carbon Steel for Data Centres Market are ArcelorMittal S.A. (Luxembourg), SSAB AB (Sweden), Stegra AB (Sweden), Nucor Corporation (U.S.), Steel Dynamics, Inc. (U.S.), Commercial Metals Company (U.S.), Cleveland-Cliffs Inc. (U.S.), thyssenkrupp Steel Europe AG (Germany), Salzgitter AG (Germany), voestalpine AG (Austria), Tata Steel Limited (India), Nippon Steel Corporation (Japan), JFE Steel Corporation (Japan), POSCO Holdings Inc. (South Korea), Hyundai Steel Company (South Korea), Gerdau S.A. (Brazil), Celsa Group (Spain), and Emirates Steel Arkan (U.A.E.).
The companies profiled in this report were selected on the basis of verified activity as of October 2026 in the supply of steel products offered with a documented lower-emissions attribute suitable for construction use, whether through a branded low-carbon product line, a product-level environmental declaration programme or a third-party certified route. Producers without a documented low-carbon construction product offering, producers active only in flat products for automotive or packaging applications, scrap merchants and processors without steelmaking operations, and certification bodies and verification providers were excluded, as were companies whose relevant operations could not be verified as active at the time of writing.
- ArcelorMittal S.A. · Luxembourg
- SSAB AB · Sweden
- Stegra AB · Sweden
- Nucor Corporation (U.S.)
- Steel Dynamics, Inc. (U.S.)
- Commercial Metals Company (U.S.)
- Cleveland-Cliffs Inc. (U.S.)
- Salzgitter AG · Germany
- Tata Steel Limited · India
- Nippon Steel Corporation · Japan
- JFE Steel Corporation · Japan
- POSCO Holdings Inc. · South Korea
- Hyundai Steel Company · South Korea
- Gerdau S.A. · Brazil
- Celsa Group · Spain
- Emirates Steel Arkan (U.A.E.)
Expert perspectives
This market is usually described as a premium product category whose growth depends on how much extra buyers are prepared to pay for cleaner steel. That framing misses what is actually happening. Demand here is being created by disclosure law with a date attached, not by willingness to pay. Life-cycle global warming potential must be calculated and disclosed in the energy performance certificate of new buildings above one thousand square metres from 1 January 2028 and of all new buildings from 1 January 2030, under a common method set by Delegated Regulation (EU) 2026/52, which entered into force on 24 May 2026. Every new European data centre is above that threshold, and design freeze precedes construction by years, so projects being specified now are already inside the requirement. Meanwhile the supply that was promised against this demand has thinned, with ArcelorMittal suspending EUR 1.3 billion of DRI-EAF investment at Bremen and Eisenhuettenstadt in June 2025. The binding constraint is therefore shifting from buyer willingness to pay towards the physical availability of documented low-carbon tonnes.
Three structural changes are expected to shape competitive positions through 2036. First, the basis of qualification will move from production route to verified intensity. Buyers are learning that a route announcement is not a deliverable tonne, and a documented figure for material available this year is worth more in a tender than a commitment to a technology that has slipped. Second, the requirement will spread from the structural frame to the whole building, because the disclosure method covers the full emissions chain. That brings carbon specification into decking, reinforcement, containment and support steel, scopes bought on price through distribution by parties who have never been asked for emissions data, and it transfers advantage to manufacturers who control their own bill of materials. Third, allocation accounting will be tested. Mass-balance and book-and-claim is the fastest-growing certification route precisely because physical near-zero capacity is short, and a method that grows because supply is scarce is a method whose rules will be examined.
For companies planning entry or expansion, the implication is that documentation capability and scrap position are the assets that matter in this decade, and hydrogen capability is an asset for the next one. A producer with verified product-level declarations and reliable access to quality scrap can serve the requirement that exists, at a premium that reflects scarcity of documentation rather than scarcity of technology. A producer betting on hydrogen-based conversion is making a correct long-term judgement on a timetable it does not control, and should size that bet against contracted offtake rather than against announced demand. For buyers, the symmetrical conclusion is that a commitment should be written in terms of a verified intensity figure and a volume, not in terms of a production route, because a route can be deferred while a figure can be audited.
Two cautions belong in any assessment of this market. The first concerns the durability of allocated attributes. A material share of reported low-carbon steel procurement rests on allocation methods whose treatment under disclosure regimes is not settled, and a buyer who has reported a reduction on that basis carries restatement risk that does not appear in the contract. The second concerns the relationship between this market and construction volume. Growth here is penetration multiplied by tonnage, and the tonnage follows a construction cycle that reverses faster than it builds. A producer sizing capacity against the penetration curve alone will overbuild, because a downturn in data centre construction reduces the denominator while the regulatory requirement continues to raise the ratio, and the two effects do not offset in revenue terms.
Overall, the core of demand through the forecast period will continue to sit in scrap-based electric arc furnace structural sections and plate supplied to the structural frame of hyperscale projects under product-level declarations, while the fastest growth will come from hydrogen-based routes, near-zero intensity tiers, galvanized and coated flat products, electrical and mechanical support steel, allocation-based certification and colocation construction, as a requirement created by law spreads into scopes and regions that have not yet had to answer it.
Customer perspectives
Director of Sustainable Construction, Hyperscale Operator
This perspective captures the shift in buyer emphasis from production route to verified present availability. It positions established electric arc furnace producers with product-level declarations ahead of integrated producers selling conversion plans, and it indicates that documentation quality has become the qualifying criterion in this market rather than technology choice.
Head of Procurement, Data Centre General Contractor
This perspective identifies where the growth in this market is actually located. It confirms that the extension of disclosure to the whole building is pulling carbon requirements into fragmented, distribution-led scopes with low current penetration, and that the commercial opportunity sits with manufacturers who can produce a figure in categories where incumbents cannot.
Sustainability Lead, Colocation Provider
This perspective illustrates how disclosure obligations transfer down the chain to parties who did not originate them, and it identifies the central risk in the fastest-growing certification route. It suggests that buyers exposed to third-party audit will discount allocated attributes relative to physically distinct material, which places a limit on how far allocation accounting can substitute for capacity.
Frequently asked questions
The market was valued at USD 3,280.0 million in 2025 and is estimated at USD 3,960.0 million in 2026.
Cite this report
Meticulous Research. (2026). Low-carbon Steel for Data Centres Market - Global Opportunity Analysis and Industry Forecasts (2026-2036) (Report No. MRCHM - 1042409). Meticulous Market Research Pvt. Ltd. https://www.meticulousresearch.com/product/low-carbon-steel-for-data-centres-market-7092