What This Brief Covers
This Meticulous Next™ brief examines superconducting cables, meaning power cables whose conductor is a high-temperature superconducting tape cooled by liquid nitrogen, which carries current with almost no resistive loss. It tests whether urban and data centre demonstrations move these cables from field tests to a commercial option for congested corridors, and which participants capture value among cable makers, tape manufacturers, cooling suppliers and operators.
Demonstrations have moved to higher voltages and longer circuits. A review in Superconductor Science and Technology in 2026 lists alternating current field tests that include a 154 kV, 600 MVA cable of 1 km in Jeju in 2016, a 35 kV, 1,200 m circuit in Shanghai in 2021 and a 110 kV, 500 MVA, 120 m test in Munich in 2024. The conclusion is that the cable has been proven at distribution and sub-transmission voltage, and the open question is delivery at commercial length.
The next step is a city link. The SuperLink project in Munich plans a 15 km, 110 kV connection of 500 MVA, with all three cores in one cryostat and a single intermediate cooling station, led by Stadtwerke München with NKT, Linde, THEVA, Karlsruhe Institute of Technology and South Westphalia University, with funding from the German federal ministry. The conclusion is that a project of this length would show whether cooling and installation work at the scale a utility needs.
Data centres are now the second demand source. Microsoft said in February 2026 that it is exploring high-temperature superconductors for data centre and transmission power, and funded a demonstration by VEIR in which the cable delivered the same power at about one tenth of the size and weight of standard systems. VEIR has also raised USD 75 million in a Series B round led by Munich Re Ventures. The conclusion is that buyers with limited land and fast growing load are willing to pay for compact power delivery.
The brief treats superconducting cables as an emerging signal with a twelve year horizon to 2038. It identifies which cable types, regions and companies scale first and what each means for utilities, data centre operators and manufacturers. It is a focused 109-page decision brief that presents an indicative trajectory rather than a segmented market model.
| Parameter | Details |
|---|---|
| Forward horizon | 2026–2038 (12 years) |
| Emerging force | Superconducting cables: urban and data centre demonstrations of high-temperature superconducting power cables |
| Technology readiness | Field tests up to 154 kV and 1 km; a 15 km, 110 kV city link in development in Munich; data centre cables in demonstration |
| Indicative market size & forecast | The superconducting cables market, covering high-temperature superconducting cable systems including tape, cable core, cryostat, cooling plant, terminations and installation for utility, data centre, rail and industrial use, and excluding superconducting magnets, fault current limiters and conventional cables, is valued at USD 0.1–0.2 billion in 2026 and is projected to reach USD 1.46–2.91 billion by 2038, at a CAGR of 25% |
| Mainstream inflection | ~2033, when the first long urban links are in service and tape cost per kA metre has halved from the 2026 level |
| Signal strength | A planned 15 km, 500 MVA city link in Germany, a funded data centre demonstration by a technology buyer and a USD 75 million Series B round for one developer |
| Primary beneficiaries | Cable makers with delivered projects; tape makers with scale; utilities and data centre operators with limited space |
| Brief length / format | 109 pages · PDF + executive summary deck · instant delivery |
Understanding the Technology
A high-temperature superconducting cable carries current in thin ceramic tapes that lose their electrical resistance when cooled to about minus 196 degrees Celsius with liquid nitrogen. The tapes sit in a cable core inside a vacuum insulated cryostat, and a cooling plant circulates the liquid nitrogen along the route.
Because the tape carries far more current than copper of the same size, one cable can replace several conventional cables. A worked example from Nexans shows a 300 MW data centre at 34 kV served by one superconducting cable in place of up to 36 conventional cables, a vendor figure that the brief treats as an upper bound.
Performance depends on current density, on cooling energy and heat in-leak, which the Munich design holds to about 0.8 W per metre in a 12 m cryostat sample, and on tape supply. The review cites a tape cost of about EUR 80–100 per kA metre at 77 K, expected to fall by about half within four to five years.
Uses are urban grid reinforcement where new corridors are hard to build, data centre power feeds, rail and industrial direct current supply, and longer term subsea and transmission concepts.
The limits are cost against conventional cable, cooling reliability and energy use, a short operating record and utility caution. The period turns on whether tape cost keeps falling while the first long links run without outages.
Market Outlook
The superconducting cables market, covering high-temperature superconducting cable systems including tape, cable core, cryostat, cooling plant, terminations and installation for utility, data centre, rail and industrial use, and excluding superconducting magnets, fault current limiters and conventional cables, is valued at USD 0.1–0.2 billion in 2026 and is projected to reach USD 1.46–2.91 billion by 2038, at a CAGR of 25%.
The 2026 base rests on cable systems for demonstrations and early commercial projects in Europe, China, Korea, Japan and the United States, plus the first data centre pilots. Growth then follows the Munich link, further urban links and data centre feeds as tape cost falls.
The forecast is sensitive to tape cost, cooling plant reliability, utility willingness to adopt and data centre power density. Regionally, Europe leads through publicly funded city links, China and Korea follow with utility programmes, and the United States grows through data centre demand.
Scenarios
The base case assumes tape cost per kA metre halves, the Munich link and data centre pilots run without major outages and utilities order further links, so that the first long urban links are in service by 2033. An accelerated case assumes data centre demand pulls forward volume orders and faster tape scale-up, bringing the inflection to 2030 and lifting the 2038 value to the top of the range. A delayed case assumes cooling failures or slow tape cost decline, moving the inflection to 2036 and holding growth at the bottom of the range.
Factors Behind Growth
Growth drivers
- Data centre power density.
- Urban grid congestion.
- Limits on rights of way.
- Electrification of rail and industry.
Enablers
- Falling tape cost.
- Standard cryogenic modules.
- Public research funding.
- Venture and corporate investment.
Restraints and barriers
- Cost against conventional cable.
- Cooling reliability and energy use.
- Limited operating record.
- Utility caution on new technology.
The Forces at Play
The direction of superconducting cables is set by urban and data centre demonstrations, tape cost and supply, cooling system maturity, grid congestion and right-of-way limits, and public funding with utility trials.
Adoption Outlook
How the shift is likely to unfold across three time horizons.
Data centre pilots operate and urban demonstrations are completed.
The first commercial urban links enter service and tape capacity expands.
Superconducting cables become a standard option for congested corridors.
Latest Strategic Developments
| Date | Development | Type | Significance |
|---|---|---|---|
| Jun 2025 | Nexans unveils a demonstration in Hanover of low voltage alternating and direct current superconducting cables for data hall power | Demonstration | Brings superconducting cable to data centre infrastructure |
| Feb 2026 | Microsoft says it is exploring high-temperature superconductors for data centre and transmission power, after funding a VEIR demonstration | Corporate programme | Shows a technology buyer backing compact power delivery |
Key Players & Competitive Landscape
The key participants in superconducting cables include Nexans S.A., NKT A/S, LS Cable & System Ltd., Sumitomo Electric Industries, Ltd., Furukawa Electric Co., Ltd., Southwire Company, LLC, VEIR, Inc., THEVA Dünnschichttechnik GmbH, Fujikura Ltd., American Superconductor Corporation, SuNAM Co., Ltd., Shanghai Superconductor Technology Co., Ltd., Linde plc, Stadtwerke München GmbH, Microsoft Corporation, Exelon Corporation, RWE AG, Korea Electric Power Corporation, China Southern Power Grid Co., Ltd., Karlsruhe Institute of Technology, Prysmian S.p.A., Siemens Energy AG, Hitachi, Ltd., Schneider Electric SE, Eaton Corporation plc, Vertiv Holdings Co, Air Liquide S.A., Equinix, Inc., Digital Realty Trust, Inc., Amazon.com, Inc., Meta Platforms, Inc., Alphabet Inc., Consolidated Edison, Inc., National Grid plc, Munich Re AG, Oak Ridge National Laboratory, U.S. Department of Energy, European Commission, Federal Ministry for Economic Affairs and Energy and International Council on Large Electric Systems.
The brief profiles representative participants in each archetype and assesses which are positioned to lead as demonstrations move to commercial links.
Nexans, NKT and LS Cable lead among cable system suppliers, Sumitomo Electric, Fujikura, THEVA and SuNAM lead among tape makers, and VEIR leads among start-ups focused on data centres. Competitive intensity is low because few firms can deliver a full system, and rising in tape as Asian makers add capacity.
| Archetype | Representative players | Position in 2026 | Outlook to 2038 |
|---|---|---|---|
| Cable system suppliers | Nexans, NKT, LS Cable and System, Sumitomo Electric Industries, Furukawa Electric, Southwire, Prysmian | Superconducting cable systems | Design and supply cable systems |
| Superconducting tape manufacturers | THEVA Dünnschichttechnik, Fujikura, SuNAM, Shanghai Superconductor Technology, American Superconductor | High-temperature superconducting tape | Make the conductor |
| Cryogenic and equipment suppliers | Linde, Air Liquide, Siemens Energy, Hitachi, Schneider Electric, Eaton, Vertiv | Cooling plant and power equipment | Supply cooling and terminations |
| Utilities and data centre operators | Stadtwerke München, Exelon, RWE, Korea Electric Power, China Southern Power Grid, Consolidated Edison, National Grid, Microsoft, Equinix, Digital Realty, Amazon.com, Meta Platforms, Alphabet | Trials, ownership and offtake | Buy and operate cable links |
| Start-ups and investors | VEIR, Munich Re | Data centre cable and venture funding | Develop products and fund pilots |
| Research institutes, agencies and associations | Karlsruhe Institute of Technology, Oak Ridge National Laboratory, U.S. Department of Energy, European Commission, Federal Ministry for Economic Affairs and Energy, International Council on Large Electric Systems | Research funding and standards | Fund projects and set standards |
Where value migrates.
In 2026 value sits with cable system suppliers and start-ups with funded pilots, because buyers look first for proof of operation. By 2032 it moves toward tape and cryogenic suppliers at scale, because tape cost and cooling reliability set the price of every project. By 2038 it settles with operators that own installed networks and can add links where corridors are short. Margins hold for suppliers with delivered projects and low tape cost and narrow for integrators buying tape and cooling plant at market prices.
Who Will Win — and Why
The archetypes best positioned to capture value as the shift matures.
Firms with operating circuits at voltage and length close to commercial need.
Firms that expand capacity and cut cost per kA metre.
Utilities and data centre owners that learn from pilots and order the first commercial links.
Regulatory Landscape
| Jurisdiction | Milestone | Indicative timing | Effect on adoption |
|---|---|---|---|
| Germany | Federal funding for the SuperLink city link in Munich | In force | Supports the first long urban link |
| European Union | Research and innovation programmes for compact power cables | In force | Support demonstrators such as SupraMarine and SCARLET |
| France | France 2030 grant for the SupraMarine cable demonstrator | In force | Supports a subsea demonstrator targeted for 2028 |
| United States | Federal programmes for grid resilience and data centre power | In force | Support utility and data centre trials |
| International | Standards for superconducting cable testing and cryogenic systems | In development | Give buyers a basis to compare systems |
Investment Signals
The signals converge on proof at length and cost. A planned 15 km, 500 MVA link in Munich, a funded data centre demonstration and a Series B round of USD 75 million support growth, while tape cost, cooling reliability and a short operating record limit the pace.
Structural limits show where progress could slow: tape price, cooling plant uptime, installation cost and utility caution. The brief therefore tracks four indicators: tape cost per kA metre, longest operating circuit, data centre pilots in service and utility orders.
Distribution and city links in Europe and Asia first, then data centre feeds in the United States, then longer transmission and subsea links are the expected order of adoption.
Questions This Brief Answers
Strategic Implications
- Cable and tape suppliers: deliver operating circuits at commercial length, cut tape cost and secure cooling suppliers.
- Utilities and data centre operators: run trials on congested corridors and power dense sites, and set reliability targets for cooling.
- Cryogenic suppliers: standardise cooling modules for uptime.
- Investors and lenders: back suppliers with operating references and treat cooling failures and tape cost as the main risks.
- Governments: fund long demonstrations and standards that move cables from pilot to commercial use.
"A superconducting cable can carry the power of dozens of copper cables in one pipe. The next twelve years decide whether anyone can afford to cool it."
Table of Contents
Access & Licensing
A focused foresight brief, priced to circulate. Every option is delivered instantly and backed by analyst support.
every brief