Networked geothermal Market Outlook 2026–2036: Growth Drivers, Key Companies, Strategic Developments & Adoption Forecast — A Meticulous Next™ Foresight Brief
What This Brief Covers
This Meticulous Next™ brief examines networked geothermal, meaning shared underground loops that connect many buildings to boreholes and let heat pumps in each building draw heat from or reject heat to the ground, owned and run by a utility. It tests whether utility-led pilots turn into rate-based thermal services that replace gas distribution in cities, and which participants capture value among utilities, developers, equipment makers and regulators.
The operating base is small. Eversource completed the first utility-owned networked geothermal system in the United States, in Framingham, Massachusetts, in 2024, serving about 140 residential and commercial customers from dozens of boreholes drilled several hundred feet down, where the ground holds near 55 °F. A second phase would add about 140 customers and roughly double capacity at about half the cost of the initial buildout, because pumping and control equipment is reused and fewer new boreholes are needed as heating and cooling loads balance across buildings. The conclusion is that cost per customer falls as a network grows, which is the economic case for utility ownership.
Policy is moving faster than construction. Massachusetts passed the first law in the country allowing gas utilities to pilot geothermal networks in 2021, New York followed with the Utility Thermal Energy Network and Jobs Act in 2022, and by 2026 more than a dozen states have passed laws covering pilots, studies, grants or utility ownership, including Colorado, Minnesota, Washington, Maryland, Illinois, Texas, Connecticut and Rhode Island. In New York alone 11 pilots had been proposed by April 2025, including three by Con Edison in New York City. The conclusion is that gas utilities now have a legal route to sell thermal service, and the pace of build depends on regulatory approval.
Approval and funding set the next steps. The Massachusetts Department of Public Utilities held a technical session on 23 June 2026 on the petition of Eversource for a regulatory framework for networked geothermal services, and the US Department of Energy announced USD 8.6 million in December 2025 for the Framingham expansion, with Eversource aiming to begin construction by the end of 2026 once the state regulator approves. The conclusion is that the period to 2028 decides whether a rate framework exists, and without one networks remain demonstration projects.
The brief treats networked geothermal as an accelerating signal with a ten year horizon to 2036. It identifies which utilities, states and customer groups scale first and what each means for utilities, developers, equipment makers and regulators. It is a focused 104-page decision brief that presents an indicative trajectory rather than a segmented market model.
| Parameter | Details |
|---|---|
| Forward horizon | 2026–2036 (10 years) |
| Emerging force | Networked geothermal heat: utility-led thermal networks replacing gas distribution in cities |
| Technology readiness | One utility-owned network in operation at Framingham; pilots in design or construction in Boston and New York; rate frameworks under review |
| Indicative market size & forecast | The networked geothermal market, covering boreholes, distribution loops, building heat pumps and thermal service revenue of utility-led thermal energy networks, and excluding single-building geothermal heat pumps, deep geothermal district heating from hydrothermal wells and campus systems owned by a single customer, is valued at USD 0.2–0.4 billion in 2026 and is projected to reach USD 1.72–3.44 billion by 2036, at a CAGR of 24% |
| Mainstream inflection | ~2031, when networks of 1,000 or more customers operate under approved utility rate frameworks in at least three states |
| Signal strength | Phase 2 funding of USD 8.6 million announced in December 2025 and a regulatory technical session on a rate framework in June 2026 |
| Primary beneficiaries | Utilities with operating networks and approved frameworks; developers with drilling and design capacity; equipment makers with network-scale heat pumps |
| Brief length / format | 104 pages · PDF + executive summary deck · instant delivery |
Understanding the Technology
Networked geothermal connects many buildings to a shared loop of water that runs through boreholes in the ground. Each building has its own heat pump, which draws heat from the loop in winter and returns heat to it in summer, so a building that needs cooling supplies heat to a neighbour that needs heating.
Loops run near ground temperature, about 55 °F in Framingham, rather than at the high temperatures of a steam or hot water district heating system, which lowers heat loss in the pipes and allows the use of plastic pipe.
Performance depends on the balance of heating and cooling loads across buildings, the spacing and depth of boreholes, and the efficiency of heat pumps in cold weather.
Uses are heating and cooling for homes, public housing, schools and commercial buildings in dense neighbourhoods where gas pipes are due for replacement.
The limits are regulatory approval times, upfront capital cost for each customer, drilling noise and community acceptance, and changes in federal funding. The period turns on whether regulators approve rate frameworks that let utilities recover network costs.
Market Outlook
The networked geothermal market, covering boreholes, distribution loops, building heat pumps and thermal service revenue of utility-led thermal energy networks, and excluding single-building geothermal heat pumps, deep geothermal district heating from hydrothermal wells and campus systems owned by a single customer, is valued at USD 0.2–0.4 billion in 2026 and is projected to reach USD 1.72–3.44 billion by 2036, at a CAGR of 24%.
The 2026 base rests on the Framingham network, utility pilots in Boston and New York and the engineering and drilling work that supports them. Growth then follows the Framingham expansion, approval of rate frameworks, pilots required by state law and the first networks of 1,000 or more customers.
The forecast is sensitive to regulatory timing, federal grants and tax credits, drilling cost and customer uptake. Regionally, North America holds nearly all of the base through Massachusetts, New York and Colorado, Europe follows through district heating operators and national programmes, and Asia-Pacific adds city-scale projects later in the period.
Scenarios
The base case assumes the Massachusetts regulator approves a framework by 2027, Framingham doubles in size by 2028 and the first networks of 1,000 or more customers operate by 2031.
An accelerated case assumes several states approve rate frameworks by 2027 and federal grants continue, bringing the inflection to 2029 and lifting the 2036 value to the top of the range.
A delayed case assumes slow approvals and reduced federal funding, moving the inflection to 2034 and holding growth at the bottom of the range.
Factors Behind Growth
Growth drivers
- Cost of replacing ageing gas pipes.
- Balanced heating and cooling loads.
- State laws enabling utility networks.
- Federal grants for expansion.
Enablers
- Gas utility workforce and rights of way.
- Nonprofit and consortium learning programmes.
- Federal tax credits for geothermal heating and cooling.
- Public housing and municipal anchor customers.
Restraints and barriers
- Regulatory approval timelines.
- Upfront capital cost per customer.
- Drilling noise and community acceptance.
- Changes in federal funding.
The Forces at Play
The direction of networked geothermal is set by the cost of gas distribution replacement, utility ownership of thermal service, state legislation and pilots, federal grants and tax credits, and regulatory approval and rate design.
Adoption Outlook
How the shift is likely to unfold across three time horizons.
Framingham expands and Boston and New York pilots report while regulators set rate frameworks.
Networks of 1,000 or more customers operate under approved utility rates.
Networked geothermal is a standard alternative to gas pipe replacement in dense neighbourhoods.
Latest Strategic Developments
| Date | Development | Type | Significance |
|---|---|---|---|
| Dec 2024 | The US Department of Energy announces federal funding for a second phase of the Framingham networked geothermal system in Massachusetts | Funding announced | Starts the path to doubling the first utility-owned network |
| Apr 2025 | New York has proposed 11 geothermal network pilots, including three by Con Edison in New York City, one by National Fuel Gas in Buffalo and one by Central Hudson in Poughkeepsie | Pilot pipeline | Shows the scale of the New York pilot programme |
| Jul 2025 | A federal budget law phases out tax credits for wind, solar and electric vehicles while leaving the credits for geothermal heating and cooling largely intact | Federal policy | Keeps a federal incentive for network customers |
| Nov 2025 | The US Department of Energy eliminates its Office of Energy Efficiency and Renewable Energy and moves the geothermal office into a new Hydrocarbons and Geothermal Energy Office | Federal reorganisation | Changes the federal office that funds geothermal programmes |
| Dec 2025 | The US Department of Energy announces a USD 8.6 million grant for the Framingham expansion, adding about 140 customers | Grant | Funds the first expansion of a utility-owned network |
| Jun 2026 | The Massachusetts Department of Public Utilities holds a technical session on the petition of Eversource for a regulatory framework for networked geothermal services | Regulatory session | Moves the rate framework toward a decision |
Key Players & Competitive Landscape
The key participants in networked geothermal include Eversource Energy, National Grid plc, Consolidated Edison, Inc., National Fuel Gas Company, Fortis Inc., Xcel Energy Inc., Home Energy Efficiency Team, Ameresco, Inc., Dandelion Energy, Inc., Trane Technologies plc, Carrier Global Corporation, Johnson Controls International plc, Phoenix Foundation Co., U.S. Department of Energy, Massachusetts Clean Energy Center, Massachusetts Department of Public Utilities, New York State Energy Research and Development Authority, Boston Housing Authority, City of Framingham, Oak Ridge National Laboratory, New York State Public Service Commission, Colorado Public Utilities Commission, Minnesota Public Utilities Commission, Washington Utilities and Transportation Commission, Maryland Public Service Commission, Illinois Commerce Commission, California Public Utilities Commission, Rhode Island Public Utilities Commission, Vermont Public Utility Commission, New Jersey Board of Public Utilities, Connecticut Department of Energy and Environmental Protection, Building Decarbonization Coalition, Clean Energy States Alliance, Learning from the Ground Up Consortium, American Gas Association, Geothermal Exchange Organization, International Ground Source Heat Pump Association, Massachusetts Institute of Technology and University at Albany.
The brief profiles representative participants in each archetype and assesses which are positioned to lead as rate frameworks are approved.
Eversource leads on operating networks, National Grid and Con Edison lead among utilities with large pilots, and Home Energy Efficiency Team leads among nonprofits that support utility programmes. Competitive intensity is low in networked geothermal and rising as gas utilities and developers enter.
| Archetype | Representative players | Position in 2026 | Outlook to 2036 |
|---|---|---|---|
| Gas and electric utilities | Eversource Energy, National Grid, Consolidated Edison, National Fuel Gas Company, Fortis, Xcel Energy | Operating networks, pilots and rate petitions | Own, build and operate networks |
| Developers, drillers and engineering firms | Ameresco, Dandelion Energy, Phoenix Foundation Co. | Borehole drilling, design and construction | Build boreholes and connect buildings |
| Heat pump and equipment makers | Trane Technologies, Carrier Global Corporation, Johnson Controls International | Building-scale and network-scale heat pumps | Supply heat pumps and controls |
| Regulators and public funders | U.S. Department of Energy, Massachusetts Department of Public Utilities, Massachusetts Clean Energy Center, New York State Energy Research and Development Authority, New York State Public Service Commission, Colorado Public Utilities Commission, Minnesota Public Utilities Commission, Illinois Commerce Commission | Approvals, rates and grants | Set approval, rate and grant rules |
| Public housing and municipal customers | Boston Housing Authority, City of Framingham, University at Albany | Anchor customers and sites | Connect buildings and host boreholes |
| Nonprofits, laboratories and associations | Home Energy Efficiency Team, Oak Ridge National Laboratory, Massachusetts Institute of Technology, Building Decarbonization Coalition, Clean Energy States Alliance, American Gas Association, Geothermal Exchange Organization, International Ground Source Heat Pump Association | Learning programmes, research and advocacy | Generate evidence and represent the field |
Where value migrates.
In 2026 value sits with utilities that hold operating pilots and grants, because few networks exist and each result informs regulators. By 2031 it moves toward utilities with approved rate frameworks, because recovery of network cost through rates is what allows a utility to build at scale. By 2036 it settles in utilities and developers that run fleets of networks across several cities. Margins hold for utilities with regulated returns and drilling know-how and narrow for developers reliant on a single pilot or grant.
Who Will Win — and Why
The archetypes best positioned to capture value as the shift matures.
Firms with networks in service and rate recovery approved by a regulator.
Firms that drill boreholes and connect buildings at falling cost per customer.
Firms whose heat pumps are designed for shared loops and cold climates.
Regulatory Landscape
| Jurisdiction | Milestone | Indicative timing | Effect on adoption |
|---|---|---|---|
| Massachusetts | Laws of 2021, 2022 and 2024 enabling gas utility pilots and thermal service, and a regulatory framework petition under review | In force; framework under review | Decide whether Eversource can scale beyond Framingham |
| New York | Utility Thermal Energy Network and Jobs Act of 2022 | In force | Enables utility pilots, including 11 proposed |
| Colorado, Minnesota and Washington | Thermal energy and natural gas innovation laws, with a 2026 Colorado law on local government networks | In force | Require gas utility pilots and fund local projects |
| Maryland, Illinois and Rhode Island | Pilot and ownership laws, including a 2026 Rhode Island Thermal Energy Network and Jobs Act | In force | Require pilots and allow gas utility ownership |
| United States federal | Tax credits for geothermal heating and cooling and Department of Energy grants | In force | Reduce cost of networks and fund expansion |
Investment Signals
The signals converge on funding and approval. An operating network at Framingham, USD 8.6 million of grant funding announced in December 2025, 11 proposed pilots in New York and laws in more than a dozen states support growth, while approval times, capital cost per customer and changes in federal funding limit the pace.
Structural limits show where progress could slow: regulatory timelines, upfront capital cost, drilling noise and community acceptance, and federal funding. The brief therefore tracks four indicators: customers connected, rate frameworks approved, boreholes drilled and grant funding awarded.
Expansion of the operating network first, then pilots in public housing and city neighbourhoods, then networks of 1,000 or more customers under approved rates are the expected order of adoption.
Questions This Brief Answers
Strategic Implications
- Utilities: file rate frameworks early, build on existing rights of way and workforce, and gather customer evidence from pilots.
- Developers and equipment makers: design for shared loops, cut cost per borehole and partner with utilities that hold approvals.
- Regulators and public housing owners: set clear approval and rate structures and use public housing sites as anchor customers.
- Investors and funders: back utilities with approved frameworks and treat regulatory timing and federal funding as the main risks.
- Policy makers: keep tax credits and grant programmes steady so that second and third networks can reach financing.
"A gas pipe is replaced once in half a century. Networked geothermal asks whether the next pipe under the street should carry heat from the ground instead."
Table of Contents
Access & Licensing
A focused foresight brief, priced to circulate. Every option is delivered instantly and backed by analyst support.
every brief