Mechanical energy storage Market Outlook 2026–2038: Growth Drivers, Key Companies, Strategic Developments & Adoption Forecast — A Meticulous Next™ Foresight Brief
What This Brief Covers
This Meticulous Next™ brief examines mechanical energy storage, meaning compressed air and gravity systems that store energy as pressure or height and return it as electricity, as alternatives to batteries for long-duration storage. It tests whether utility-scale compressed air projects and gravity storage pilots move from demonstration to a commercial option, and which participants capture value among developers, equipment suppliers and utilities.
Compressed air has reached utility scale in China. A salt cavern plant in Huai'an, Jiangsu, was switched on in January 2026 with 2.4 GWh of storage from two 300 MW non-combustion units, and its supplier Harbin Electric reports 71% conversion efficiency. Zhongchu Guoneng completed a 300 MW, 1.8 GWh plant at Feicheng in April 2024 at 72.1% system efficiency, with unit costs more than 30% below its earlier 100 MW plant at Zhangjiakou. The conclusion is that plants of 300 MW and above now operate with efficiency near 70%, and cost falls with each larger plant.
The pipeline is moving to gigawatt-hour scale. The Sanmenxia project in Henan, at 700 MW and 4,200 MWh, was approved on 24 November 2025 with construction expected in 2026, and a comparable 700 MW, 2,800 MWh project in a neighbouring province is reported to have cost CNY 4.8–6.0 billion. The conclusion is that projects of six hours duration and above are being approved in volume, and developers are betting that long life offsets the capital cost.
Gravity storage is at an earlier stage. Energy Vault began commissioning a 25 MW, 100 MWh EVx system at Rudong, Jiangsu, in June 2023, expecting round-trip efficiency above 80% against more than 75% reported for its 5 MW tower. The conclusion is that gravity storage has moved from a single tower to a first grid-connected system, but published operating results are still thin compared with compressed air.
The brief treats mechanical energy storage as an emerging signal with a twelve year horizon to 2038. It identifies which storage types, regions and companies scale first and what each means for utilities, developers and equipment suppliers. It is a focused 114-page decision brief that presents an indicative trajectory rather than a segmented market model.
| Parameter | Details |
|---|---|
| Forward horizon | 2026–2038 (12 years) |
| Emerging force | Mechanical energy storage: utility-scale compressed air projects and gravity storage pilots |
| Technology readiness | Compressed air plants of 300 MW to 600 MW operating in China; 700 MW plants approved; gravity storage at first grid-connected system scale |
| Indicative market size & forecast | The mechanical energy storage market, covering compressed air and gravity storage plants including compressors, expanders, caverns and vessels, weights, hoists, power electronics, construction and installation, and excluding pumped hydro, flywheels and liquid air storage, is valued at USD 0.8–1.4 billion in 2026 and is projected to reach USD 8.7–15.22 billion by 2038, at a CAGR of 22% |
| Mainstream inflection | ~2032, when several compressed air plants of 300 MW and above have published multi-year operating and cost data |
| Signal strength | A 2.4 GWh plant switched on in January 2026, a 4.2 GWh project approved in November 2025 and efficiency of 71–72% reported at operating plants |
| Primary beneficiaries | Developers with operating plants; equipment suppliers with proven turbomachinery; grid companies procuring long-duration storage |
| Brief length / format | 114 pages · PDF + executive summary deck · instant delivery |
Understanding the Technology
Compressed air energy storage uses surplus electricity to compress air into an underground cavern or a vessel and releases it through a turbine when power is needed. Newer non-combustion designs recover the heat of compression, which raises efficiency, and do not burn gas.
Gravity storage lifts heavy weights with surplus electricity and lowers them through a generator when power is needed. Designs use stacked blocks in a tower or weights in a shaft.
Performance depends on round-trip efficiency, duration, plant size and the geology or structure that holds the air or weights. Salt caverns give cheap, large storage volume, but suitable geology is limited.
Uses are bulk storage of six hours or more for utilities, grid support in regions with large wind and solar output and co-location with renewable plants.
The limits are capital cost and project size, siting constraints, competition from lithium-ion batteries and a short operating history. The period turns on whether the first plants confirm cost and efficiency in daily use.
Market Outlook
The mechanical energy storage market, covering compressed air and gravity storage plants including compressors, expanders, caverns and vessels, weights, hoists, power electronics, construction and installation, and excluding pumped hydro, flywheels and liquid air storage, is valued at USD 0.8–1.4 billion in 2026 and is projected to reach USD 8.7–15.22 billion by 2038, at a CAGR of 22%.
The 2026 base rests on operating compressed air plants in China, projects under construction and a small number of gravity systems. Growth then follows provincial storage targets in China, the first plants outside China and the growing demand for storage lasting six hours or more.
The forecast is sensitive to capital cost per kWh, efficiency in operation, the price of lithium-ion storage and the pace of approvals. Regionally, China holds nearly all of the base, North America and Europe begin with a small number of projects, and the Middle East and Australia follow where wind and solar output is high.
Scenarios
The base case assumes operating plants confirm efficiency near 70%, capital cost falls with scale and several plants of 300 MW and above have multi-year data by 2032. An accelerated case assumes fast cost decline and supportive procurement outside China, bringing the inflection to 2030 and lifting the 2038 value to the top of the range. A delayed case assumes lithium-ion cost falls faster or operating problems appear, moving the inflection to 2036 and holding growth at the bottom of the range.
Factors Behind Growth
Growth drivers
- Need for long-duration storage.
- Provincial and national storage targets.
- Long asset life of 25 years or more.
- Utility and developer interest in alternatives to lithium-ion batteries.
Enablers
- Turbomachinery and equipment suppliers.
- Salt caverns and suitable geology.
- Public demonstration funding.
- Operating data from the first plants.
Restraints and barriers
- Capital cost and project size.
- Siting constraints.
- Competition from lithium-ion batteries.
- Limited operating history.
The Forces at Play
The direction of mechanical energy storage is set by utility-scale compressed air projects, gravity storage pilots, demand for long-duration storage, cost against lithium-ion batteries, and supply chain and materials independence.
Adoption Outlook
How the shift is likely to unfold across three time horizons.
Projects approved in China are built and gravity pilots report results.
Gigawatt-hour compressed air plants operate and the first commercial projects open outside China.
Mechanical storage becomes a standard long-duration option.
Latest Strategic Developments
| Date | Development | Type | Significance |
|---|---|---|---|
| Aug 2023 | Energy Vault announces the start of commissioning of a 25 MW, 100 MWh EVx gravity storage system at Rudong, Jiangsu, begun in June 2023 | Project commissioning | Shows gravity storage at grid-connected scale |
| Apr 2024 | Zhongchu Guoneng completes the 300 MW, 1,800 MWh Feicheng compressed air project at 72.1% system efficiency | Project completion | Shows 300 MW plants at about 72% efficiency |
| Jan 2025 | The Hubei Yingcheng 300 MW compressed air plant reaches full-capacity grid connection | Grid connection | Adds a second 300 MW plant in operation |
| Nov 2025 | The Sanmenxia project in Henan, at 700 MW and 4,200 MWh, is approved by the local development and reform commission | Project approval | Sets a six hour, 700 MW benchmark |
| Jan 2026 | The Huai'an salt cavern plant in Jiangsu, with 2.4 GWh from two 300 MW units, is switched on at 71% efficiency | Project commissioning | Shows non-combustion salt cavern plants at gigawatt-hour scale |
| Apr 2026 | Caixin reports that a Zhongchu Guoneng executive says the industry must still show it can cut cost, set standards and run reliably at commercial scale, with the company holding more than 6,000 MW of planned or active projects | Industry assessment | Shows a large pipeline with commercial proof still to come |
Key Players & Competitive Landscape
The key participants in mechanical energy storage include Zhongchu Guoneng (Beijing) Technology Co., Ltd., Harbin Electric Corporation, Energy Vault Holdings, Inc., Hydrostor Inc., Gravitricity Limited, Dongfang Electric Corporation Limited, Shanghai Electric Group Company Limited, China Energy Engineering Corporation Limited, Siemens Energy AG, Baker Hughes Company, Everllence SE, Atlas Copco AB, State Grid Corporation of China, China Southern Power Grid Co., Ltd., China Tianying Inc., Atlas Renewable Energy LLC, Heindl Energy GmbH, Chinese Academy of Sciences, National Energy Administration, Long Duration Energy Storage Council, Corre Energy B.V., Storelectric Limited, Cheesecake Energy Limited, Augwind Energy Tech Storage Ltd., Quidnet Energy Inc., RWE AG, Uniper SE, NextEra Energy, Inc., Enel S.p.A., Iberdrola, S.A., Mitsubishi Heavy Industries, Ltd., Hitachi, Ltd., Toshiba Corporation, ABB Ltd, Tsinghua University, Sandia National Laboratories, Pacific Northwest National Laboratory, National Renewable Energy Laboratory, U.S. Department of Energy, International Energy Agency and International Renewable Energy Agency.
The brief profiles representative participants in each archetype and assesses which are positioned to lead as plants reach gigawatt-hour scale.
Zhongchu Guoneng, Harbin Electric and China Energy Engineering lead in compressed air, Energy Vault and Gravitricity lead in gravity storage, and Hydrostor leads outside China in advanced compressed air. Competitive intensity is low because few firms have operating plants, though large equipment makers are entering.
| Archetype | Representative players | Position in 2026 | Outlook to 2038 |
|---|---|---|---|
| Compressed air developers | Zhongchu Guoneng, Hydrostor, Corre Energy, Storelectric, Cheesecake Energy, Augwind Energy Tech Storage, Quidnet Energy, China Energy Engineering | Compressed air plants | Develop, build and operate plants |
| Gravity storage developers | Energy Vault, Gravitricity, Heindl Energy | Gravity systems | Develop gravity storage systems |
| Turbomachinery and equipment suppliers | Harbin Electric, Dongfang Electric, Shanghai Electric, Siemens Energy, Baker Hughes, Everllence, Atlas Copco, Mitsubishi Heavy Industries, Hitachi, Toshiba, ABB | Compressors, expanders and electrical equipment | Supply plant equipment |
| Utilities and grid companies | State Grid Corporation of China, China Southern Power Grid, China Tianying, Atlas Renewable Energy, RWE, Uniper, NextEra Energy, Enel, Iberdrola | Offtake, ownership and grid connection | Buy, own and connect storage |
| Governments and agencies | National Energy Administration, U.S. Department of Energy | Targets, funding and rules | Set targets and fund demonstration |
| Research bodies and associations | Chinese Academy of Sciences, Tsinghua University, Sandia National Laboratories, Pacific Northwest National Laboratory, National Renewable Energy Laboratory, Long Duration Energy Storage Council, International Energy Agency, International Renewable Energy Agency | Research and statistics | Test designs and publish data |
Where value migrates.
In 2026 value sits with developers that hold operating plants, because buyers need proof of efficiency and cost before they commit. By 2032 it moves toward equipment suppliers and plant operators that can build to gigawatt-hour scale at falling cost. By 2038 it settles in long-duration storage platforms that combine several storage types under one grid offer. Margins hold for firms with proven turbomachinery and low cost per kWh and narrow for early developers that depend on public funding.
Who Will Win — and Why
The archetypes best positioned to capture value as the shift matures.
Firms with plants that publish multi-year efficiency and cost data.
Firms whose compressors and expanders run reliably at 300 MW and above.
Firms that buy storage lasting six hours or more and set the technology mix.
Regulatory Landscape
| Jurisdiction | Milestone | Indicative timing | Effect on adoption |
|---|---|---|---|
| China | National and provincial storage targets and approvals for compressed air projects | In force | Drive project approvals such as Sanmenxia |
| China | Local development and reform commission approval of project filings | Project by project | Set the pace of construction starts |
| United States | Federal incentives and demonstration funding for long-duration storage | In force with changes | Support first projects outside China |
| European Union | Long-duration storage schemes and national capacity mechanisms | Varies by country | Support first commercial projects in Europe |
| International | Permitting rules for underground storage in caverns | Varies by jurisdiction | Set the pace of cavern projects |
Investment Signals
The signals converge on scale and efficiency. A 2.4 GWh plant switched on in January 2026, a 4.2 GWh project approved in November 2025 and efficiency of 71–72% at operating plants support growth, while capital cost, siting limits, battery competition and a short operating history limit the pace.
Structural limits show where progress could slow: capital cost per kWh, siting, battery prices and operating reliability. The brief therefore tracks four indicators: installed compressed air capacity, projects approved and under construction, operating efficiency and cost per kWh against lithium-ion storage.
Compressed air in China first, then compressed air outside China, then gravity storage at commercial scale are the expected order of adoption.
Questions This Brief Answers
Strategic Implications
- Developers: secure geology early, publish operating data and design plants for six hours or more.
- Equipment suppliers: prove compressors and expanders at 300 MW and above and offer performance guarantees.
- Utilities and grid companies: include mechanical storage in long-duration procurement and test it against batteries on cost over life.
- Investors and lenders: back plants with operating records and treat first-of-kind projects as higher risk.
- Governments: fund demonstration, simplify cavern permitting and define long-duration storage in market rules.
"A battery stores power for a few hours, and a cavern or a weight can hold it far longer. The next twelve years decide whether they do so at a price the grid will pay."