Hydrogen co-firing gas turbines Market Outlook 2026–2038: Growth Drivers, Key Companies, Strategic Developments & Adoption Forecast — A Meticulous Next™ Foresight Brief
What This Brief Covers
This Meticulous Next™ brief examines hydrogen co-firing in gas turbines, meaning the ability of a gas turbine to burn hydrogen blended with natural gas, and in some designs hydrogen alone, so that a plant built on natural gas today can lower its carbon emissions as low-carbon hydrogen becomes available. It tests whether record order backlogs and hydrogen blending capability turn hydrogen-ready turbines into the standard specification for new plants, and which participants capture value among turbine makers, utilities, service providers and hydrogen suppliers.
Orders are at a record. GE Vernova reported gas turbine orders and slot reservations of 116 GW at the end of the second quarter of 2026, up from 100 GW a quarter earlier, made up of 53 GW of firm backlog and 63 GW of reservations. Siemens Energy reported about 95 GW of backlog and slot reservations in August 2026, and Mitsubishi Heavy Industries reported a large frame backlog of 35 GW, up from 23 GW a year earlier. The conclusion is that the three large suppliers are sold out for years, so every new plant is specified against a delivery slot.
Capacity is the constraint. GE Vernova builds about 20 GW of gas turbines a year, plans 30 GW by 2030 and is taking reservations for 2031, while Mitsubishi orders placed from April to June 2026 are scheduled for delivery between 2028 and 2030. The conclusion is that turbines ordered now will operate on natural gas first, and hydrogen capability matters for what the plant can do in its second and third decades.
Demand is shifting toward new buyers. About 80% of the customers of GE Vernova are utilities and about 20% are data centres, and in May 2026 Tallgrass and Mitsubishi Power Americas allocated two M501JAC turbines of about 1,150 MW to the first phase of a Wyoming power hub planned to supply a data centre. The conclusion is that buyers want firm power quickly, and a path to lower emissions is a secondary choice that plants must be able to take later.
The brief treats hydrogen co-firing gas turbines as an accelerating signal with a twelve year horizon to 2038. It identifies which turbine classes, regions and companies scale first and what each means for utilities, manufacturers and hydrogen suppliers. It is a focused 110-page decision brief that presents an indicative trajectory rather than a segmented market model.
| Parameter | Details |
|---|---|
| Forward horizon | 2026–2038 (12 years) |
| Emerging force | Hydrogen co-firing gas turbines: turbine order backlogs and hydrogen blending capability |
| Technology readiness | Gas turbines sold with the ability to burn hydrogen blends; delivery slots booked to 2031; low-carbon hydrogen supply to power plants still limited |
| Indicative market size & forecast | The hydrogen co-firing gas turbines market, covering new gas turbine packages sold with hydrogen blending capability and hydrogen conversion upgrades including combustors, fuel systems and controls, and excluding hydrogen production, storage and transport, gas turbines without hydrogen capability and turbine services unrelated to hydrogen, is valued at USD 10–15 billion in 2026 and is projected to reach USD 28.13–42.19 billion by 2038, at a CAGR of 9% |
| Mainstream inflection | ~2032, when low-carbon hydrogen reaches power plants at a delivered price that allows routine blending in new and converted units |
| Signal strength | Backlog and reservations of 116 GW at one maker, about 95 GW at another and 35 GW of large frame backlog at a third, with delivery slots booked into 2031 |
| Primary beneficiaries | Manufacturers with delivery slots; service and conversion providers; utilities with hydrogen supply plans |
| Brief length / format | 110 pages · PDF + executive summary deck · instant delivery |
Understanding the Technology
A gas turbine burns fuel in a combustor to drive a generator, and in a combined cycle plant the hot exhaust also raises steam for a second turbine. Hydrogen burns faster and hotter than natural gas, so a turbine that is hydrogen capable needs a redesigned combustor, a fuel system that can handle the gas safely and controls that keep emissions and flame stable.
Makers offer hydrogen capability as a share of hydrogen by volume that the turbine can burn with natural gas, with limits that differ by model, and as upgrade packages that raise the limit of units already in service. Burning hydrogen produces no carbon dioxide, but it can raise nitrogen oxide emissions, which controls and combustor design must manage.
Performance depends on the blending limit, on the stability and emissions of the flame, and on delivery slots and manufacturing output, which at GE Vernova stand at about 20 GW a year.
Uses are new combined cycle and simple cycle plants for utilities and independent producers, firm power for data centres and industry, and conversion of existing plants.
The limits are the cost and availability of low-carbon hydrogen, hydrogen transport and storage, equipment cost and emissions rules. The period turns on whether low-carbon hydrogen reaches power plants at a price that makes blending worth using.
Market Outlook
The hydrogen co-firing gas turbines market, covering new gas turbine packages sold with hydrogen blending capability and hydrogen conversion upgrades including combustors, fuel systems and controls, and excluding hydrogen production, storage and transport, gas turbines without hydrogen capability and turbine services unrelated to hydrogen, is valued at USD 10–15 billion in 2026 and is projected to reach USD 28.13–42.19 billion by 2038, at a CAGR of 9%.
The 2026 base rests on new gas turbine packages sold with hydrogen blending capability, mainly for utilities and independent producers in the United States, Europe, Japan and the Middle East, together with early hydrogen conversion upgrades. Growth then follows delivery of the order backlog, conversion of delivered units to hydrogen blends and the first large supplies of low-carbon hydrogen to power plants.
The forecast is sensitive to the delivered price of low-carbon hydrogen, turbine cost, delivery slots and support schemes for hydrogen in power. Regionally, North America holds the largest share of orders, Europe and Japan follow because of hydrogen policy, and the Middle East and Asia-Pacific grow through new capacity.
Scenarios
Base case.
The base case assumes low-carbon hydrogen reaches power plants at a delivered price that allows routine blending, support schemes stay in place in Europe and Japan and turbine output grows toward 30 GW a year, so that hydrogen co-firing is routine by 2032.
Accelerated case.
An accelerated case assumes lower hydrogen cost and stronger carbon pricing, bringing the inflection to 2030 and lifting the 2038 value to the top of the range.
Delayed case.
A delayed case assumes hydrogen supply stays scarce and policy weakens, moving the inflection to 2036 and holding growth at the bottom of the range.
Factors Behind Growth
Growth drivers
- Utility capacity additions.
- Data centre power demand.
- Replacement of coal and older gas plants.
- Decarbonisation targets.
Enablers
- Hydrogen-ready turbine designs.
- Manufacturing expansion.
- Support schemes for low-carbon hydrogen.
- Utility and manufacturer demonstration projects.
Restraints and barriers
- Cost and availability of low-carbon hydrogen.
- Delivery slots and equipment cost.
- Hydrogen transport and storage.
- Emissions and safety requirements.
The Forces at Play
The direction of hydrogen co-firing gas turbines is set by turbine order backlogs, hydrogen blending capability, low-carbon hydrogen supply, data centre and utility demand, and climate and capacity policy.
Adoption Outlook
How the shift is likely to unfold across three time horizons.
Backlog is delivered and turbine manufacturing expands.
Delivered units begin hydrogen blending and the first large low-carbon hydrogen supplies reach plants.
Hydrogen co-firing becomes a routine mode of operation.
Latest Strategic Developments
| Date | Development | Type | Significance |
|---|---|---|---|
| Apr 2026 | GE Vernova reports gas turbine orders and slot reservations of 100 GW in its first quarter of 2026 | Company results | Shows the start of the backlog increase in 2026 |
| May 2026 | Tallgrass and Mitsubishi Power Americas allocate two M501JAC turbines of about 1,150 MW to the first phase of the Cheyenne Power Hub in Wyoming | Turbine allocation | Shows turbine supply being reserved for a data centre |
| Jul 2026 | GE Vernova reports 116 GW of orders and slot reservations at the end of the second quarter, with 20 GW signed in the quarter | Company results | Shows the largest supplier booking slots into 2031 |
| Aug 2026 | Siemens Energy reports 69 GW of gas turbine backlog and 26 GW of slot reservation agreements | Company results | Shows a second supplier with about 95 GW booked |
| Aug 2026 | Mitsubishi Heavy Industries reports a large frame gas turbine backlog of 35 GW, up from 23 GW a year earlier | Company results | Shows a third supplier increasing its backlog by half |
| Oct 2026 | Mitsubishi Heavy Industries and Ingeteam sign a non-binding memorandum of understanding on power solutions for data centres in the United States | Partnership | Adds integrated power offers for data centres |
Key Players & Competitive Landscape
The key participants in hydrogen co-firing gas turbines include GE Vernova Inc., Siemens Energy AG, Mitsubishi Heavy Industries, Ltd., Baker Hughes Company, Ansaldo Energia S.p.A., Kawasaki Heavy Industries, Ltd., Caterpillar Inc., Wärtsilä Oyj Abp, Rolls-Royce Holdings plc, Doosan Enerbility Co., Ltd., JERA Co., Inc., Uniper SE, RWE AG, Vattenfall AB, Duke Energy Corporation, The Southern Company, NextEra Energy, Inc., Entergy Corporation, Enel S.p.A., Iberdrola, S.A., Tallgrass Energy, LP, Ingeteam, S.A., Hitachi, Ltd., Air Products and Chemicals, Inc., Linde plc, Equinor ASA, Shell plc, TotalEnergies SE, Dominion Energy, Inc., Berkshire Hathaway Energy Company, Exelon Corporation, Xcel Energy Inc., NRG Energy, Inc., Vistra Corp., Microsoft Corporation, Amazon.com, Inc., Meta Platforms, Inc., Alphabet Inc., Oracle Corporation, U.S. Department of Energy, U.S. Environmental Protection Agency, International Energy Agency and Electric Power Research Institute, Inc.
The brief profiles representative participants in each archetype and assesses which are positioned to lead as delivered units move to hydrogen blends.
GE Vernova, Siemens Energy and Mitsubishi Heavy Industries lead in large turbines by backlog, Baker Hughes, Caterpillar and Kawasaki Heavy Industries lead in smaller and industrial classes, and Wärtsilä and Rolls-Royce lead in engines. Competitive intensity is low among large turbine suppliers because three firms hold most of the backlog, and higher in smaller classes and engines.
| Archetype | Representative players | Position | Outlook |
|---|---|---|---|
| Large turbine manufacturers | GE Vernova, Siemens Energy, Mitsubishi Heavy Industries, Ansaldo Energia, Doosan Enerbility | Heavy-duty and combined cycle turbines | Make and sell large turbines |
| Aeroderivative, industrial and engine suppliers | Baker Hughes, Caterpillar, Kawasaki Heavy Industries, Wärtsilä, Rolls-Royce | Aeroderivative turbines and engines | Supply smaller units and modular plants |
| Utilities and independent power producers | JERA, Uniper, RWE, Vattenfall, Duke Energy, The Southern Company, NextEra Energy, Entergy, Enel, Iberdrola, Dominion Energy, Berkshire Hathaway Energy, Exelon, Xcel Energy, NRG Energy, Vistra, Tallgrass Energy | Turbine buyers and plant owners | Order, own and operate plants |
| Hydrogen producers and suppliers | Air Products and Chemicals, Linde, Equinor, Shell, TotalEnergies | Low-carbon hydrogen | Produce and supply hydrogen |
| Data centre developers and technology companies | Microsoft, Amazon.com, Meta Platforms, Alphabet, Oracle, Ingeteam, Hitachi | Firm power demand and integrated offers | Contract and integrate firm power |
| Agencies and research institutes | U.S. Department of Energy, U.S. Environmental Protection Agency, International Energy Agency, Electric Power Research Institute | Rules, data and research | Set rules and publish data |
Where value migrates.
In 2026 value sits with manufacturers that hold delivery slots, because buyers pay for place in line. By 2032 it moves toward service and conversion providers, because delivered units need upgrades to raise hydrogen blending limits. By 2038 it settles with operators that have secured low-carbon hydrogen supply and can run their plants on it. Margins hold for suppliers with delivery slots and conversion packages and narrow for plants without hydrogen supply.
Who Will Win — and Why
The archetypes best positioned to capture value as the shift matures.
Firms with booked capacity into the early 2030s and growing output.
Firms that raise the hydrogen blending limits of delivered units.
Firms that contract low-carbon hydrogen alongside turbine purchases.
Regulatory Landscape
| Jurisdiction | Milestone | Indicative timing | Effect on adoption |
|---|---|---|---|
| European Union | Rules for hydrogen and decarbonised gas markets | In force | Set the market framework for hydrogen supply to power plants |
| Japan | Support scheme for low-carbon hydrogen supply and use | In force | Narrows the price gap between hydrogen and natural gas |
| United Kingdom | Hydrogen to power business model | In development | Would support hydrogen-fuelled power plants |
| Germany | Power plant strategy for new gas capacity that is hydrogen-ready | In development | Sets hydrogen readiness for new plants |
| United States | Federal tax and permitting policy for hydrogen and gas power | In force with changes | Shapes the economics of hydrogen blending |
Investment Signals
The signals converge on supply and timing. Order and reservation backlogs of 116 GW, about 95 GW and 35 GW at the three large suppliers and delivery slots booked into 2031 support growth, while hydrogen cost, hydrogen supply and delivery times limit the pace.
Structural limits show where progress could slow: hydrogen price and supply, turbine output, emissions rules and the cost of conversion. The brief therefore tracks four indicators: share of orders with hydrogen capability, hydrogen blends burned at plants in service, delivery slots and low-carbon hydrogen volumes delivered to power plants.
New plants with blending capability first, then conversion of delivered units, then high-share hydrogen operation are the expected order of adoption.
Questions This Brief Answers
Strategic Implications
- Turbine manufacturers: expand output, publish blending limits by model and offer conversion packages.
- Utilities and developers: specify hydrogen capability at purchase, contract slots early and plan hydrogen supply and storage.
- Service providers: prepare conversion packages for delivered units.
- Investors and lenders: back suppliers with delivery slots and treat hydrogen price and policy as the main risks.
- Governments: set support schemes and emissions rules that make hydrogen blending in power plants bankable.
"A gas turbine bought today will run for thirty years. The next twelve years decide what fuel it burns in the last twenty."
Table of Contents
Access & Licensing
A focused foresight brief, priced to circulate. Every option is delivered instantly and backed by analyst support.
every brief