Next™ BriefHVDC Transmission and the Future of Long-Distance Power
Buy Now
Meticulous Next™Energy and PowerNov 2026105 ppMRN-1430

HVDC transmission Market Outlook 2026–2038: Growth Drivers, Key Companies, Strategic Developments & Adoption Forecast — A Meticulous Next™ Foresight Brief

Brief ID: MRN-1430Format: PDF + Summary DeckDelivery: InstantHorizon: 12-yr horizonSignal: High-impact
Buy Now · $950
Adoption maturity (indexed)
Mainstream inflection: ~2032
Horizon: 2026–2038 · Signal: High-impact
12 yrs
Forward horizon
~2032
Mainstream inflection
High impact
Signal strength

What This Brief Covers

This Meticulous Next™ brief examines HVDC transmission, meaning the movement of electricity as direct current over long distances through overhead lines or cables, with converter stations at each end changing between alternating and direct current. It tests whether framework procurement and a pipeline of subsea and overland links turn HVDC into the standard way to move large amounts of power over long distances, and which participants capture value among converter suppliers, cable makers, installers and grid operators.

Grid operators have moved from single projects to long framework contracts. National Grid has set up an HVDC supply chain framework of up to GBP 59 billion, with converter stations to be supplied by GE Vernova, Hitachi Energy, Mitsubishi Electric and Siemens Energy, contracts running five years with a three year option, and Eastern Green Link 4, Sealink and LionLink among the first projects. The conclusion is that buyers are reserving factory and vessel capacity years ahead, which favours suppliers that already hold a place in the framework.

The same pattern appears in Germany. TenneT awarded the BalWin5 offshore grid connection of up to 2.2 GW to GE Vernova and Seatrium, with fabrication from January 2026, commissioning in 2032 and a route of about 325 km to Bremen-Werderland, the fourth award under a five year framework signed in March 2023. The conclusion is that a link awarded now is delivered in about six years, so supply decisions made in 2026 shape what the grid can carry in the early 2030s.

Orders for converter stations are also reaching the Mediterranean and the North Sea. Hitachi Energy was reported in June 2026 to have won a EUR 770 million order for converter stations on the Italy to Tunisia link, and in January 2026 to have been selected for converter stations on two subsea links in Scotland. The conclusion is that demand now covers cross-border trade and offshore wind connections at the same time, and a small group of converter suppliers is shared between them.

The brief treats HVDC transmission as a high-impact signal with a twelve year horizon to 2038. It identifies which link types, regions and suppliers scale first and what each means for grid operators, developers and manufacturers. It is a focused 105-page decision brief that presents an indicative trajectory rather than a segmented market model.

Brief Snapshot
ParameterDetails
Forward horizon2026–2038 (12 years)
Emerging forceHVDC transmission: converter stations, cables and framework contracts for long-distance power links
Technology readinessVoltage source converters and HVDC cables in commercial use on subsea and offshore wind links; standardised designs and multi-year frameworks being rolled out
Indicative market size & forecastThe HVDC transmission market, covering converter stations, HVDC cables and their installation for new links, and excluding alternating current transmission lines, transformers and substations outside converter stations, is valued at USD 18–26 billion in 2026 and is projected to reach USD 50.63–73.13 billion by 2038, at a CAGR of 9%
Mainstream inflection~2032, when frameworks and standard designs make HVDC the default for new long-distance links above the reach of alternating current
Signal strengthA GBP 59 billion framework in the United Kingdom, a 2.2 GW offshore connection awarded in Germany for 2032 and a EUR 770 million converter order in the Mediterranean in 2026
Primary beneficiariesConverter and cable suppliers with framework positions; installers with vessels; grid operators with standard procurement
Brief length / format105 pages · PDF + executive summary deck · instant delivery

Understanding the Technology

An HVDC link takes alternating current from the grid, converts it to direct current at a converter station, sends it along a cable or overhead line and converts it back at the far end. Because direct current avoids the charging losses of long alternating current cables, the case for HVDC grows with distance, and it is the only practical choice for long subsea routes.

Modern links use voltage source converters, which can control power flow in both directions and connect offshore wind farms, and line commutated converters for very high power overland links. Cables are extruded and wrapped in specialised factories and laid by purpose built vessels.

Performance depends on transmission losses, on converter rating and voltage, which set how much power one link carries, and on how fast factories and vessels can deliver.

Uses are offshore wind connection, cross-border interconnection, linking regions with surplus generation to load centres and reinforcement of congested corridors.

The limits are long lead times for converters and cables, limited vessel and factory capacity, consenting delays and high cost per link. The period turns on whether supply expands as fast as the projects awarded.

Market Outlook

The HVDC transmission market, covering converter stations, HVDC cables and their installation for new links, and excluding alternating current transmission lines, transformers and substations outside converter stations, is valued at USD 18–26 billion in 2026 and is projected to reach USD 50.63–73.13 billion by 2038, at a CAGR of 9%.

The 2026 base rests on converter stations, cables and installation for links under construction in Europe, China and other regions, and on awards made under framework contracts. Growth then follows the delivery of awarded links, new offshore wind connections and the first large interregional links outside Europe and Asia.

The forecast is sensitive to supplier capacity, consenting times, copper and cable material prices and grid investment rules. Regionally, Europe and China hold most of the base, the United Kingdom grows quickly through its framework, and North America, India and the Middle East grow from smaller bases.

Scenarios

The base case assumes supplier capacity expands in line with awards, consenting times hold and framework procurement spreads, so that HVDC becomes the default for new long-distance links by 2032. An accelerated case assumes faster consenting and standard designs, bringing the inflection to 2030 and lifting the 2038 value to the top of the range. A delayed case assumes factory and vessel shortages or cost overruns, moving the inflection to 2035 and holding growth at the bottom of the range.

Factors Behind Growth

Growth drivers

  • Offshore wind connection.
  • Cross-border and interregional flows.
  • Grid reinforcement programmes.
  • Demand growth from electrification and data centres.

Enablers

  • Multi-year framework agreements.
  • Standardised converter designs.
  • Supplier capacity expansion.
  • Regulator support for network investment.

Restraints and barriers

  • Converter station supply constraints.
  • Cable factory and vessel capacity.
  • Planning and consent delays.
  • High cost of long-distance links.

The Forces at Play

The direction of HVDC transmission is set by interregional links, converter station supply, cable manufacturing capacity, framework procurement by grid operators and planning and consent timelines.

Adoption Outlook

How the shift is likely to unfold across three time horizons.

Near term2026–2028
Delivery of awards

Awarded links move into fabrication and converter and cable capacity expands.

Mid term2028–2032
Peak delivery

Framework projects reach peak delivery and the first large interregional links appear outside Europe and Asia.

Long term2032–2038
Standard backbone

HVDC becomes the standard backbone for long-distance power transmission.

Latest Strategic Developments

DateDevelopmentTypeSignificance
Mar 2023TenneT signs a five year framework agreement for 2 GW offshore grid connection systemsFramework agreementSets the model of standard designs and reserved capacity
Dec 2025TenneT awards the BalWin5 offshore grid connection of up to 2.2 GW to GE Vernova and Seatrium, with commissioning in 2032Contract awardShows a link awarded now delivering in about six years
Jan 2026Hitachi Energy is selected for converter stations on two subsea links in ScotlandContract awardAdds converter demand from United Kingdom subsea links
Jun 2026Hitachi Energy is reported to win a EUR 770 million order for converter stations on the Italy to Tunisia linkContract awardExtends converter demand to cross-border links in the Mediterranean

Key Players & Competitive Landscape

The key participants in HVDC transmission include Hitachi, Ltd., Siemens Energy AG, GE Vernova Inc., Mitsubishi Electric Corporation, NKT A/S, Prysmian S.p.A., Nexans S.A., Sumitomo Electric Industries, Ltd., LS Cable & System Ltd., Taihan Cable & Solution Co., Ltd., Cenergy Holdings S.A., Seatrium Limited, TenneT Holding B.V., National Grid plc, State Grid Corporation of China, China Southern Power Grid Co., Ltd., Toshiba Corporation, SSE plc, Office of Gas and Electricity Markets, European Network of Transmission System Operators for Electricity, Amprion GmbH, TransnetBW GmbH, 50Hertz Transmission GmbH, Terna S.p.A., Red Eléctrica Corporación, S.A., RTE Réseau de transport d’électricité, Elia Group SA, Statnett SF, Fingrid Oyj, EirGrid plc, Power Grid Corporation of India Limited, Saudi Electricity Company, Ørsted A/S, RWE AG, Vattenfall AB, Iberdrola, S.A., DEME Group NV, Jan De Nul Group, Royal Boskalis Westminster N.V., Subsea7 S.A., Department for Energy Security and Net Zero, European Commission, U.S. Department of Energy, Federal Energy Regulatory Commission and International Council on Large Electric Systems.

The brief profiles representative participants in each archetype and assesses which are positioned to lead as awarded links move into delivery.

Hitachi Energy, GE Vernova, Siemens Energy and Mitsubishi Electric lead in converter stations, NKT, Prysmian and Nexans lead in high voltage cables, and Seatrium and the large marine contractors lead in platforms and installation. Competitive intensity is high among the few converter suppliers and rising in cables as Asian makers expand.

ArchetypeRepresentative playersPositionOutlook
Converter station suppliersHitachi, Siemens Energy, GE Vernova, Mitsubishi Electric, ToshibaConverter stations and controlsDesign and supply converters
HVDC cable manufacturersNKT, Prysmian, Nexans, Sumitomo Electric Industries, LS Cable and System, Taihan Cable and Solution, Cenergy HoldingsSubsea and underground cableMake and supply cable systems
Platform and installation contractorsSeatrium, DEME Group, Jan De Nul Group, Royal Boskalis Westminster, Subsea7Offshore platforms and cable layingBuild platforms and lay cable
Transmission system operators and utilitiesTenneT, National Grid, State Grid Corporation of China, China Southern Power Grid, Amprion, TransnetBW, 50Hertz, Terna, Red Eléctrica, RTE, Elia Group, Statnett, Fingrid, EirGrid, Power Grid Corporation of India, Saudi Electricity Company, SSELink ownership and operationProcure, own and operate links
Developers and wind ownersØrsted, RWE, Vattenfall, IberdrolaOffshore wind connection demandDrive demand for offshore connections
Governments, regulators and associationsOffice of Gas and Electricity Markets, Department for Energy Security and Net Zero, European Commission, U.S. Department of Energy, Federal Energy Regulatory Commission, European Network of Transmission System Operators for Electricity, International Council on Large Electric SystemsNetwork planning, cost recovery and standardsSet rules and publish plans

Where value migrates.

In 2026 value sits with converter and cable suppliers that hold framework positions, because grid operators reserve capacity years ahead. By 2032 it moves toward installers and platform contractors, because vessels and platform yards set the pace of delivery. By 2038 it settles with operators that run standardised networks and can add links quickly. Margins hold for suppliers with secured factory slots and narrow for those competing on price for single projects.

Who Will Win — and Why

The archetypes best positioned to capture value as the shift matures.

Converter suppliers with framework positions

Firms that hold places in multi-year frameworks and can build standard designs in volume.

Cable makers with secured capacity

Firms that have added factories and hold long term material supply.

Operators with standardised procurement

Grid operators that reuse designs and contract capacity early.

Regulatory Landscape

JurisdictionMilestoneIndicative timingEffect on adoption
United KingdomRegulated investment in network reinforcement and offshore connectionsIn forceSupport projects such as Eastern Green Link 4 and Sealink
European UnionNetwork development plans and cross-border project rulesIn force with updatesSupport interconnectors and offshore grid connections
GermanyOffshore grid connection plans under the system operator frameworkIn forceSet the pipeline of links such as BalWin5
ChinaNational programme of ultra-high-voltage linksIn forceSupport long-distance links from generation regions to load centres
United StatesFederal and state work on interregional transmission planning and cost sharingIn developmentSet conditions for the first large new links

Investment Signals

The signals converge on supply and delivery. A GBP 59 billion framework in the United Kingdom, a 2.2 GW connection awarded for 2032 in Germany and a EUR 770 million converter order in the Mediterranean support growth, while limited converter, cable and vessel capacity and long consenting times limit the pace.

Structural limits show where progress could slow: factory slots, vessel availability, consent timelines and cost recovery rules. The brief therefore tracks four indicators: contracts awarded under frameworks, cable and converter capacity added, links in construction and consents granted.

Subsea and offshore wind links in Europe first, then interregional overland links in Asia and the Middle East, then large links in North America are the expected order of adoption.

Questions This Brief Answers

01What is HVDC transmission, and why does it matter?
02What is the market size in 2026, and what is the forecast to 2038?
03Which links and contracts are awarded or under construction today?
04What factors are driving growth, and what barriers remain?
05Which key participants are active, and which archetypes are positioned to win?
06What are the latest developments?
07How will supply capacity and planning shape the market between 2026 and 2038?
08What should grid operators, developers and suppliers do now?

Strategic Implications

  • Converter and cable suppliers: add capacity, secure positions in grid operator frameworks and show delivery on time.
  • Grid operators and developers: reserve capacity early, reuse standard designs and align consents with fabrication slots.
  • Installers and platform contractors: secure vessels and yards for the early 2030s peak.
  • Investors and lenders: back suppliers with framework positions and treat cost overruns and consent delays as the main risks.
  • Governments and regulators: set cost recovery and planning rules that allow multi-year procurement.
Analyst Perspective

"A link awarded today carries power in about six years. The next twelve years decide who has the factories and vessels to build it."

Lead Foresight Analyst
Power Transmission & Grid Infrastructure · Meticulous Next™

Table of Contents

Access & Licensing

A focused foresight brief, priced to circulate. Every option is delivered instantly and backed by analyst support.

Single Brief
$950
One named user
Full PDF brief
Executive summary deck
One named user
Free outlook update
★ Most Popular
Team License
$1,350
Up to 10 users
Access for 2–10 users
Internal sharing rights
30-minute analyst briefing
Enterprise
$2,150
Organization-wide
Organization-wide access
Unlimited users
Priority analyst access
Custom extracts
Included with
every brief
Analyst-reviewed foresightMulti-signal validationInstant deliveryFree outlook updates

Frequently Asked Questions

Search Market Intelligence

Search across reports, blogs, press releases, and industries