Next™ BriefGrid Interconnection Queues and the Future of Capacity Addition
Buy Now
Meticulous Next™Energy and PowerNov 2026101 ppMRN-1431

Grid interconnection Market Outlook 2026–2034: Growth Drivers, Key Companies, Strategic Developments & Adoption Forecast — A Meticulous Next™ Foresight Brief

Brief ID: MRN-1431Format: PDF + Summary DeckDelivery: InstantHorizon: 8-yr horizonSignal: High-impact
Buy Now · $950
Adoption maturity (indexed)
Mainstream inflection: ~2030
Horizon: 2026–2034 · Signal: High-impact
8 yrs
Forward horizon
~2030
Mainstream inflection
High impact
Signal strength

What This Brief Covers

This Meticulous Next™ brief examines grid interconnection, meaning the studies, agreements and network upgrades that a power plant, storage project or large electricity user must complete before it connects to the grid. It tests whether federal rules, cluster studies and automated study tools turn the interconnection queue from a bottleneck into a routine process, and which participants capture value among grid operators, software providers, engineering firms and developers.

The queue is very large and moves slowly. Lawrence Berkeley National Laboratory counted 2,061 GW of active capacity in 8,244 requests in the United States at the end of 2025, down 10% from a year earlier, yet only 53 GW out of the 2,290 GW active in the 2024 queue reached operation during 2025, about 2%. The conclusion is that a request is far more likely to be withdrawn than built, so queue size overstates the capacity that will be added.

Time is the main cost. Projects built in 2025 took a median of 61 months from request to commercial operation, against 36 months in 2015, and of requests made from 2000 to 2020 only 19% by number reached operation while 71% were withdrawn. The conclusion is that developers plan around long and uncertain timelines, which raises financing costs and favours projects that are ready early.

The mix of the queue is shifting. Gas capacity in the queue rose 86% to 253 GW during 2025 while solar fell 19% to 773 GW, storage fell 16% to 749 GW and wind fell 19% to 220 GW. In PJM, 51 projects totalling 9,361 MW of unforced capacity were selected in May 2025 for fast-track studies, most of them gas. The conclusion is that urgent demand for firm capacity is pulling gas projects ahead of renewable projects through the queue.

The brief treats grid interconnection as a high-impact signal with an eight year horizon to 2034. It identifies which reforms, tools and regions clear the queue first and what each means for utilities, developers and software and engineering providers. It is a focused 101-page decision brief that presents an indicative trajectory rather than a segmented market model.

Brief Snapshot
ParameterDetails
Forward horizon2026–2034 (8 years)
Emerging forceGrid interconnection: federal reform, cluster studies and automated study tools for clearing interconnection queues
Technology readinessCluster study processes adopted or in transition at most balancing areas; automation and AI study tools in pilot at MISO, SPP, PJM, CAISO and ISO New England
Indicative market size & forecastThe grid interconnection market, covering interconnection study and queue management software, study and engineering services and process automation, and excluding network upgrade construction, generation equipment and transmission hardware, is valued at USD 1.2–1.8 billion in 2026 and is projected to reach USD 2.77–4.15 billion by 2034, at a CAGR of 11%
Mainstream inflection~2030, when cluster studies and automated tools deliver study results within set deadlines and median time to operation falls below the 2015 level of 36 months
Signal strengthHigh-impact: a queue of 2,061 GW with only 2% reaching operation in 2025, a median of 61 months to operation and automation pilots at five operators
Primary beneficiariesStudy software and engineering providers; developers with ready projects and site control; operators with automated processes
Brief length / format101 pages · PDF + executive summary deck · instant delivery

Understanding the Technology

A generation, storage or large load project asks the grid operator to study how it would affect the network. The operator tests the connection, identifies the upgrades needed and sets the cost, after which the project signs an agreement and builds its connection. Under older rules requests were studied one at a time, which meant a change in one project forced restudies of those behind it.

Cluster studies group requests and study them together in batches. Order No. 2023 of the Federal Energy Regulatory Commission, issued on 28 July 2023, set a 150-day cluster study, larger study deposits, site control of 90% at submission and penalties for withdrawal and for missed study deadlines.

Automation tools run power flow and screening studies faster. A pilot of SUGAR software from Pearl Street Technologies at MISO reportedly cut study time by 98%, SPP works with Hitachi on an artificial intelligence tool and with GridUnity on process automation, and PJM works with Alphabet on readiness review.

Uses are generator and storage interconnection, large load connection for data centres and factories, and queue management and reporting for utilities and developers.

The limits are study staffing, data quality, withdrawals that force restudies, delays in studies of affected neighbouring systems and the cost of network upgrades. The period turns on whether cluster studies and automation shorten the median time to operation.

Market Outlook

The grid interconnection market, covering interconnection study and queue management software, study and engineering services and process automation, and excluding network upgrade construction, generation equipment and transmission hardware, is valued at USD 1.2–1.8 billion in 2026 and is projected to reach USD 2.77–4.15 billion by 2034, at a CAGR of 11%.

The 2026 base rests on study and queue management software, study and engineering services and process automation at grid operators and utilities in the United States, plus early activity in other markets. Growth then follows the shift to cluster studies, wider use of automation and the creation of processes for large loads.

The forecast is sensitive to rule changes at the Federal Energy Regulatory Commission, withdrawal rates, operator staffing and the volume of data centre load requests. Regionally, the United States holds nearly all of the base, and other markets grow from a smaller base as they reform their own queues.

Scenarios

The base case assumes cluster studies are completed on schedule, automation spreads beyond pilots and withdrawals fall as deposits and readiness rules take effect, so that study results arrive within set deadlines by 2030. An accelerated case assumes fast adoption of automation and a smaller number of speculative requests, bringing the inflection to 2028 and lifting the 2034 value to the top of the range. A delayed case assumes staffing shortages, restudies and large load surges, moving the inflection to 2033 and holding growth at the bottom of the range.

Factors Behind Growth

Growth drivers

  • Electricity demand growth.
  • Renewable and storage build-out.
  • Federal and state reform.
  • Resource adequacy needs.

Enablers

  • Cluster study rules.
  • Study automation software.
  • Fast-track processes.
  • Heatmaps and data access.

Restraints and barriers

  • Study backlogs and staffing.
  • Withdrawals and restudies.
  • Network upgrade cost and delay.
  • Affected system study delays.

The Forces at Play

The direction of grid interconnection is set by federal rules on interconnection, automation of studies, large load growth from data centres, fast-track paths for resource adequacy and the allocation of network upgrade costs.

Adoption Outlook

How the shift is likely to unfold across three time horizons.

Near term2026–2028
Cluster transition

Operators complete the move to cluster studies and roll out automation pilots.

Mid term2028–2031
Backlog clearing

Legacy queues clear and large load processes are set up at regional transmission organisations.

Long term2031–2034
Routine process

Interconnection becomes a routine, largely automated process.

Latest Strategic Developments

DateDevelopmentTypeSignificance
Jul 2023The Federal Energy Regulatory Commission issues Order No. 2023, requiring cluster studies, larger deposits, site control and penalties for missed study deadlinesFederal ruleSets the national basis for first-ready, first-served interconnection
May 2024Compliance filings for Order No. 2023 fall due after extensions from the original December 2023 dateCompliance deadlineMoves operators to the new process
May 2025PJM selects 51 projects totalling 9,361 MW of unforced capacity under its Reliability Resource Initiative, from 94 applicationsFast-track selectionShows urgent demand for firm capacity, mostly gas, moving ahead in the queue
Jun 2026Lawrence Berkeley National Laboratory publishes Queued Up 2026, showing 2,061 GW active at the end of 2025 and 53 GW reaching operation during the yearQueue reportQuantifies the backlog and the low completion rate
Jun 2026The Federal Energy Regulatory Commission opens six show-cause proceedings requiring grid operators to explain how they will speed large load interconnectionRegulatory proceedingExtends interconnection reform to data centres and factories

Key Players & Competitive Landscape

The key participants in grid interconnection include PJM Interconnection, L.L.C., Midcontinent Independent System Operator, Inc., Southwest Power Pool, Inc., California Independent System Operator Corporation, Electric Reliability Council of Texas, Inc., ISO New England Inc., New York Independent System Operator, Inc., Federal Energy Regulatory Commission, Lawrence Berkeley National Laboratory, Hitachi, Ltd., Alphabet Inc., Pearl Street Technologies, Inc., GridUnity, Inc., Burns & McDonnell Engineering Company, Inc., Black & Veatch Holding Company, Quanta Services, Inc., Duke Energy Corporation, NextEra Energy, Inc., American Electric Power Company, Inc., Berkshire Hathaway Energy Company, Dominion Energy, Inc., The Southern Company, Xcel Energy Inc., Entergy Corporation, Exelon Corporation, Edison International, PG&E Corporation, Vistra Corp., Invenergy LLC, The AES Corporation, Microsoft Corporation, Amazon.com, Inc., Meta Platforms, Inc., Equinix, Inc., Digital Realty Trust, Inc., U.S. Department of Energy, North American Electric Reliability Corporation, American Clean Power Association, Solar Energy Industries Association and Electric Power Research Institute, Inc.

The brief profiles representative participants in each archetype and assesses which are positioned to lead as queues move to cluster studies and automated tools.

The seven regional grid operators control the process in their regions, Pearl Street Technologies, GridUnity and Hitachi lead among the providers of study and automation tools, and Burns & McDonnell and Black & Veatch lead among engineering firms. Competitive intensity is rising among software providers as operators move from pilots to contracts, and is low among operators, which each hold a regional monopoly on their process.

ArchetypeRepresentative playersPosition in 2026Outlook to 2034
Grid operatorsPJM Interconnection, Midcontinent Independent System Operator, Southwest Power Pool, California Independent System Operator, Electric Reliability Council of Texas, ISO New England, New York Independent System OperatorInterconnection process and studiesRun queues and studies
Study software and automation providersPearl Street Technologies, GridUnity, Hitachi, AlphabetStudy and process automationSupply tools that speed studies
Engineering and construction firmsBurns & McDonnell Engineering, Black & Veatch, Quanta ServicesStudies, design and upgrade constructionPerform studies and build upgrades
Utilities and transmission ownersDuke Energy, NextEra Energy, American Electric Power, Berkshire Hathaway Energy, Dominion Energy, The Southern Company, Xcel Energy, Entergy, Exelon, Edison International, PG&E, VistraTransmission ownership and upgradesOwn the network and build upgrades
Developers and large load customersInvenergy, The AES Corporation, Microsoft, Amazon.com, Meta Platforms, Equinix, Digital RealtyGeneration, storage and data centre load requestsSubmit the requests in the queue
Regulators, laboratories and associationsFederal Energy Regulatory Commission, U.S. Department of Energy, North American Electric Reliability Corporation, Lawrence Berkeley National Laboratory, Electric Power Research Institute, American Clean Power Association, Solar Energy Industries AssociationRules, data and standardsSet rules and publish data

Where value migrates.

In 2026 value sits with engineering firms and study software providers, because operators need extra study capacity quickly. By 2030 it moves toward automation platforms embedded in operator processes, because contracts become multi-year and recurring. By 2034 it settles with developers and large load customers that hold ready sites and secured positions, because the cost of waiting falls on them. Margins hold for providers that operators cannot easily replace and narrow for those selling single studies.

Who Will Win — and Why

The archetypes best positioned to capture value as the shift matures.

Software providers embedded in operator processes

Firms whose tools run inside the study workflow of one or more operators.

Engineering firms with study capacity

Firms with trained staff and data to complete studies within set deadlines.

Developers with ready projects

Firms with site control, deposits and permits in place that move through cluster studies first.

Regulatory Landscape

JurisdictionMilestoneIndicative timingEffect on adoption
United States, federalOrder No. 2023 on cluster studies, deposits, site control and study deadlinesIn forceSet the national process for generator interconnection
United States, federalShow-cause proceedings on large load interconnectionIn progressRequire operators to propose faster processes for data centres and factories
PJMReliability Resource Initiative and move to a new Cycle process from spring 2026In forceFast-track selected projects and process the remaining queue in cycles
MISO and SPPExpedited resource adequacy studies for firm capacityIn forceMove about 29 GW and 15 GW of mostly gas projects ahead
United States, legislationProposed act on environmental review and transmissionProposed, not enactedCould speed permitting and widen federal transmission powers

Investment Signals

The signals converge on speed and readiness. A queue of 2,061 GW with only 53 GW reaching operation in 2025, a median of 61 months to operation and automation pilots at five operators support the case for reform, while staffing, withdrawals and affected system studies limit the pace.

Structural limits show where progress could slow: study staffing, restudies after withdrawals, network upgrade costs and large load surges. The brief therefore tracks four indicators: median time from request to operation, completion rate, share of capacity under signed agreements and automation tools in production use.

Cluster studies at all operators first, then automated tools in production use, then large load processes at regional transmission organisations are the expected order of adoption.

Questions This Brief Answers

01What is grid interconnection, and why does it matter?
02What is the market size in 2026, and what is the forecast to 2034?
03How large are the queues, and how much capacity reaches operation?
04What factors are driving growth, and what barriers remain?
05Which key participants are active, and which archetypes are positioned to win?
06What are the latest developments?
07How will reform and automation shape the market between 2026 and 2034?
08What should utilities, developers and providers do now?

Strategic Implications

  • Software and engineering providers: sign multi-year contracts with operators, show study time savings and add trained staff.
  • Utilities and operators: complete the move to cluster studies, put automation into production and publish data on study times.
  • Developers: secure site control early, post deposits only for ready projects and plan for upgrade cost sharing.
  • Investors and lenders: back developers with signed agreements and treat withdrawal and restudy risk as the main risk.
  • Regulators: set deadlines, cost allocation and large load rules that reduce speculative requests.
Analyst Perspective

"A queue of 2,061 GW is not a pipeline of power plants. The next eight years decide how much of it is ever built."

Lead Foresight Analyst
Grid Interconnection & Capacity Addition · Meticulous Next™

Table of Contents

Access & Licensing

A focused foresight brief, priced to circulate. Every option is delivered instantly and backed by analyst support.

Single Brief
$950
One named user
Full PDF brief
Executive summary deck
One named user
Free outlook update
★ Most Popular
Team License
$1,350
Up to 10 users
Access for 2–10 users
Internal sharing rights
30-minute analyst briefing
Enterprise
$2,150
Organization-wide
Organization-wide access
Unlimited users
Priority analyst access
Custom extracts
Included with
every brief