Electrically heated steam cracker furnaces Market Outlook 2026–2038: Growth Drivers, Key Companies, Strategic Developments & Adoption Forecast — A Meticulous Next™ Foresight Brief
What This Brief Covers
This Meticulous Next™ brief examines electrically heated steam cracker furnaces, which replace the fuel fired furnaces that crack naphtha and other hydrocarbons into ethylene and propylene at about 850 degrees Celsius. It tests whether demonstration plants and pilot reactors move to commercial furnaces in existing and new crackers before 2038.
The emissions case is large. Ethylene production is about 160 million tonnes a year and causes more than 260 million tonnes of carbon dioxide, and burning fuel to heat the furnaces accounts for 90 percent of the carbon dioxide from ethylene plants. The conclusion is that the furnace, not the feedstock, is where most of the avoidable emissions sit, and electric heating on renewable power targets the largest share.
The first large demonstration is running. BASF, SABIC and Linde started two electrically heated furnaces at Ludwigshafen in April 2024, processing about 4 tonnes of feedstock an hour on 6 MW of renewable electricity, with a target of emissions at least 90 percent lower and a German grant of EUR 14.8 million. The conclusion is that a licensor, a producer and an engineering firm have moved from design to operating data, and Linde plans to sell the technology as STARBRIDGE if the demonstration succeeds.
Scale and power set the limits. A cracker producing 1 million tonnes of ethylene a year would draw 350 to 400 MW of electricity, and electric furnaces lose the hydrogen and methane co-products that fired furnaces use as fuel. The conclusion is that the pace of adoption depends on renewable power prices and grid connections more than on furnace technology.
The brief treats electrically heated steam cracker furnaces as an accelerating signal with a twelve year horizon to 2038. It identifies which heating concepts, regions and companies move first and what each means for producers and suppliers. It is a focused 113-page decision brief that presents an indicative trajectory rather than a segmented market model.
| Parameter | Details |
|---|---|
| Forward horizon | 2026–2038 (12 years) |
| Emerging force | Electric cracking: electric steam cracker pilots in the chemical industry |
| Technology readiness | One demonstration plant of two furnaces at 4 tonnes of feedstock an hour and 6 MW operating since April 2024; one electric reactor pilot cracking naphtha at large scale; multi-megawatt pilots under evaluation |
| Indicative market size & forecast | The electrically heated steam cracker furnaces market, covering electric furnace systems for ethylene and propylene production, power equipment and installation supplied for them, and related engineering and service, and excluding conventional fired furnaces, electric kilns, electric boilers, and the ethylene and propylene produced, is valued at USD 0.1–0.2 billion in 2026 and is projected to reach USD 2.8–5.6 billion by 2038, at a CAGR of 32% |
| Mainstream inflection | ~2032, when the first commercial electric furnaces operate in existing crackers and licensors offer performance guarantees |
| Signal strength | Three licensor and producer groups testing electric furnaces, a demonstration plant on 6 MW and public grants of EUR 14.8 million and EUR 3.5 million |
| Primary beneficiaries | Licensors with operating demonstration furnaces; ethylene producers with low cost renewable power; suppliers of high current power equipment |
| Brief length / format | 113 pages · PDF + executive summary deck · instant delivery |
Understanding the Technology
A steam cracker passes hydrocarbons through coils in a furnace at about 850 degrees Celsius, and conventional furnaces heat the coils by burning fuel. Electric furnaces replace the burners with electric heating, so the carbon dioxide from the furnace falls with the carbon content of the power supplied.
The Ludwigshafen demonstration tests two ways to do this: one furnace passes an electric current directly through the cracking coils, and the other uses heating elements around the coils that heat them by radiation. Both are integrated into existing crackers at the BASF site. The conclusion is that producers can test electric heating alongside fired furnaces without building a new plant.
A third route uses electric motors to spin blades that heat and crack the feedstock. Coolbrook reported cracking naphtha in a large-scale pilot in the Netherlands in January 2024, with a reactor that exceeds 1,000 degrees Celsius and a claim of up to 20 percent more ethylene than traditional crackers. The conclusion is that electric reactors may reach higher temperatures than coil heating, although the yield claim comes from the developer and has to be proven in operation.
Hybrid designs keep gas-fired furnaces running while others are electrified, which limits the new power needed.
The limits are the cost and availability of renewable electricity, the loss of co-product fuel, the grid connection of hundreds of megawatts and the remaining life of existing furnaces. The period turns on whether power prices allow electric furnaces to compete with fired furnaces.
Market Outlook
The electrically heated steam cracker furnaces market, covering electric furnace systems for ethylene and propylene production, power equipment and installation supplied for them, and related engineering and service, and excluding conventional fired furnaces, electric kilns, electric boilers, and the ethylene and propylene produced, is valued at USD 0.1–0.2 billion in 2026 and is projected to reach USD 2.8–5.6 billion by 2038, at a CAGR of 32%.
The 2026 base rests on demonstration furnaces, pilot reactors, power equipment and engineering for them, mainly in Germany, the Netherlands and the United States. Growth then follows commercial orders from ethylene producers, which begin once demonstration data support performance guarantees.
The forecast is sensitive to renewable power prices, grid capacity at cracker sites and the timing of the first commercial orders. Regionally, Europe holds the largest base, followed by North America and the Middle East.
Scenarios
The base case assumes demonstration results meet the 90 percent emissions target and renewable power becomes available at cracker sites, bringing the inflection to about 2032. An accelerated case assumes lower power prices and early performance guarantees, bringing the inflection to 2030 and lifting the 2038 value to the top of the range. A delayed case assumes high power prices and grid delays, moving the inflection to 2035 and holding growth at the bottom of the range.
Factors Behind Growth
Growth drivers
- Cracker emissions reduction of at least 90 percent.
- Pressure to cut emissions of ethylene.
- Renewable power supply.
- Plant integration without new sites.
Enablers
- Public grants.
- Licensor commercialisation.
- Power equipment suppliers.
- Operating data from demonstration units.
Restraints and barriers
- Electricity cost and availability.
- Loss of co-product fuel.
- Grid connection of hundreds of megawatts.
- Capital cost and plant life of existing furnaces.
The Forces at Play
The direction of electrically heated steam cracker furnaces is set by emissions from cracking, renewable electricity prices, public funding for industrial decarbonisation, commercialisation by licensors and customer decarbonisation commitments.
Adoption Outlook
How the shift is likely to unfold across three time horizons.
Operating data come from the Ludwigshafen furnaces and multi-megawatt pilots are evaluated.
The first commercial electric furnaces and hybrid retrofits are installed in existing crackers.
Electric furnaces become a standard option for new and rebuilt crackers.
Latest Strategic Developments
| Date | Development | Type | Significance |
|---|---|---|---|
| Mar 2021 | BASF, SABIC and Linde sign an agreement to build an electrically heated steam cracking furnace demonstration plant | Partnership | Starts the first large-scale demonstration |
| Jun 2022 | Shell and Dow start an experimental electric cracking furnace unit at a research campus in Amsterdam | Pilot | Adds a second licensor and producer group |
| Jun 2023 | LyondellBasell, Chevron Phillips Chemical and Technip Energies agree to evaluate an electric furnace demonstration unit | Partnership | Widens the field to United States producers |
| Sep 2023 | Coolbrook completes the first phase of large-scale testing of its electric reactor at Chemelot in the Netherlands | Pilot | Shows an electric reactor route |
| Jan 2024 | Coolbrook reports cracking naphtha in a large-scale pilot in the Netherlands | Pilot | Confirms cracking in an electric reactor |
| Apr 2024 | BASF, SABIC and Linde start the electrically heated furnaces at Ludwigshafen, processing about 4 tonnes of feedstock an hour on 6 MW | Demonstration plant | First large-scale operating data |
Key Players & Competitive Landscape
The key participants in electrically heated steam cracker furnaces include BASF SE, Saudi Basic Industries Corporation, Linde plc, Shell plc, Dow Inc., Coolbrook Oy, LyondellBasell Industries N.V., Chevron Phillips Chemical Company LLC, Technip Energies N.V., ABB Ltd, KBR, Inc., Lummus Technology LLC, ExxonMobil Corporation, TotalEnergies SE, INEOS Group Holdings S.A., Borealis AG, China Petroleum & Chemical Corporation, Braskem S.A., Siemens Energy AG, Hitachi Energy Ltd, Saudi Arabian Oil Company, Reliance Industries Limited, LG Chem, Ltd., Lotte Chemical Corporation, Repsol, S.A., OMV Aktiengesellschaft, Westlake Corporation, NOVA Chemicals Corporation, Sumitomo Chemical Co., Ltd., Mitsui Chemicals, Inc., ArcelorMittal S.A., Cemex, S.A.B. de C.V., Stichting Institute for Sustainable Process Technology, Netherlands Organisation for Applied Scientific Research, Utrecht University, Massachusetts Institute of Technology, American Chemistry Council, European Chemical Industry Council, Federal Ministry for Economic Affairs and Climate Action of Germany, Government of the Netherlands and European Commission.
The brief profiles representative participants in each archetype and assesses which are positioned to lead as commercial furnaces arrive.
BASF, SABIC and Linde lead with the only large demonstration plant in operation, Shell and Dow follow with pilot units, and Coolbrook leads among specialist developers with a reactor pilot. Competitive intensity is low, because only a few groups hold operating electric furnace data.
| Archetype | Representative players | Position | Outlook |
|---|---|---|---|
| Technology licensors and engineering firms | Linde, Technip Energies, KBR, Lummus Technology, ABB | Furnace design, engineering and licensing | Commercialise electric furnaces |
| Ethylene producers | BASF, SABIC, Shell, Dow, LyondellBasell, Chevron Phillips Chemical, ExxonMobil, TotalEnergies, INEOS, Borealis, Sinopec, Braskem, Saudi Aramco, Reliance Industries, LG Chem, Lotte Chemical, Repsol, OMV, Westlake, NOVA Chemicals, Sumitomo Chemical, Mitsui Chemicals | Operate crackers and host pilots | Test and buy electric furnaces |
| Specialist developers | Coolbrook | Electric motor driven reactor | Develop an alternative reactor |
| Power equipment suppliers | Siemens Energy, Hitachi Energy, ABB | Transformers and high current supply | Supply power equipment |
| Governments and industry bodies | Federal Ministry for Economic Affairs and Climate Action of Germany, Government of the Netherlands, European Commission, American Chemistry Council, European Chemical Industry Council | Grants and industry direction | Fund projects and set direction |
| Research bodies | Stichting Institute for Sustainable Process Technology, Netherlands Organisation for Applied Scientific Research, Utrecht University, Massachusetts Institute of Technology | Studies of flexible operation and power demand | Review technology and power needs |
Where value migrates.
In 2026 value sits with demonstration furnaces, pilot reactors and the engineering around them. By 2032 it moves toward furnace supply and retrofits at existing crackers, with power equipment as a large part of each project. By 2038 it settles with power supply and services, as electricity becomes the main cost of cracking. Margins hold for licensors with operating references and narrow for suppliers without them.
Who Will Win — and Why
The archetypes best positioned to capture value as the shift matures.
Licensors with operating data and performance guarantees win the first commercial orders.
Producers with cheap renewable power at the cracker site run electric furnaces at costs close to fired furnaces.
Suppliers of transformers and high current equipment gain from every furnace, as each plant needs hundreds of megawatts.
Regulatory Landscape
| Jurisdiction | Milestone | Indicative timing | Effect on adoption |
|---|---|---|---|
| Germany, Decarbonisation in Industry programme | Grant of EUR 14.8 million to the BASF, SABIC and Linde demonstration plant | In force | Funds the first large-scale demonstration |
| Netherlands, Dutch government grant | Grant of EUR 3.5 million to the Shell and Dow electric furnace project with ISPT and TNO, awarded in 2021 | Awarded 2021 | Funds a second pilot route |
Investment Signals
The signals converge on a short path from demonstration to commercial furnaces. A running 6 MW plant, a pilot reactor cracking naphtha and several licensor and producer groups support growth, while power cost, grid connection and the loss of co-product fuel hold back orders.
Structural limits show where progress could slow: electricity prices, grid capacity, retrofit cost and plant life. The brief therefore tracks four indicators: operating hours of demonstration furnaces, megawatts of electric furnace capacity ordered, electricity use per tonne of ethylene and grant budgets.
Demonstration data first, then multi-megawatt pilots, then hybrid retrofits and new furnaces is the expected order of adoption.
Questions This Brief Answers
Strategic Implications
- Chemical producers: plan furnace replacement against the remaining life of existing furnaces and secure renewable power contracts at cracker sites.
- Technology suppliers: publish operating data and offer performance guarantees to move from demonstration to commercial orders.
- Power equipment suppliers: prepare transformers and high current supply for hundreds of megawatts per site.
- Governments: keep grants for demonstration in place and speed up grid connections.
- Investors: favour licensors with operating references and producers with low cost renewable power.
"Nine tenths of the carbon dioxide from an ethylene plant comes from heating the furnace. The next twelve years decide how much of that heat comes from a power line."