Cement and steel carbon capture Market Outlook 2026–2038: Growth Drivers, Key Companies, Strategic Developments & Adoption Forecast — A Meticulous Next™ Foresight Brief
What This Brief Covers
This Meticulous Next™ brief examines point-source carbon capture at cement, steel and chemicals plants, meaning capture units fitted to the stacks and process streams of industrial sites that cannot avoid CO2 emissions. It tests whether the first commercial plants, tax credits and public funding lead to a series of projects, and which producers, technology suppliers and engineering firms gain.
The first commercial cement plant is operating, with limits. Heidelberg Materials inaugurated its Brevik plant in Norway in June 2025 with capacity of 400,000 tonnes of CO2 per year, yet the capture rate stood at 50% in January 2026 because of limited waste heat. The conclusion is that capture works on a cement kiln at commercial scale, and heat supply and plant integration decide the share of emissions captured.
Projects are following, but scale is small against the sector. Heidelberg Materials announced the Padeswood plant in Wales for nearly 800,000 tonnes per year with commissioning in 2029, Holcim and Air Liquide signed an agreement in February 2026 for 1.1 million tonnes per year at Obourg in Belgium, and planned projects would still capture less than 2% of cement emissions by 2035. The conclusion is that the first wave proves the technology, and a much larger wave of final investment decisions is needed for the sector to be affected.
Funding and storage links decide which projects proceed. The Brevik funding model covered more than 80% of capital costs, projects in Sweden and California were delayed, paused or cancelled after losing government finance, and the Obourg decision depends on partnerships along the value chain and public support. The conclusion is that public funding and access to transport and storage remain the conditions for every project.
The brief treats cement and steel carbon capture as an accelerating signal with a twelve year horizon to 2038. It identifies which industries, capture routes and companies move first and what each means for producers, suppliers and engineering firms. It is a focused 115-page decision brief that presents an indicative trajectory rather than a segmented market model.
| Parameter | Details |
|---|---|
| Forward horizon | 2026–2038 (12 years) |
| Emerging force | Industrial carbon capture: first commercial cement capture plants and 45Q credits |
| Technology readiness | One commercial cement capture plant in operation; commercial chemicals capture starting; further cement plants planned for 2026 to 2029; steel capture mostly in development |
| Indicative market size & forecast | The cement and steel carbon capture market, covering capture plant engineering, equipment and services at cement, steel, chemicals and fertiliser sites, and excluding CO2 transport and storage, power plant capture, gas processing and direct air capture, is valued at USD 1.2–1.8 billion in 2026 and is projected to reach USD 17.46–26.19 billion by 2038, at a CAGR of 25% |
| Mainstream inflection | ~2031, when at least four commercial cement plants operate and the first commercial steel and chemicals plants follow with shared storage in place |
| Signal strength | Brevik in operation, Padeswood and Obourg planned at 800,000 and 1.1 million tonnes per year, and more than 175 projects tracked worldwide |
| Primary beneficiaries | Producers with plants in operation; technology suppliers with references; producers with funded projects and storage access |
| Brief length / format | 115 pages · PDF + executive summary deck · instant delivery |
Understanding the Technology
Cement, steel and chemicals plants release CO2 from fuel and from the process itself. In cement, limestone releases CO2 when it is heated, so fuel switching cannot remove all emissions, and cement accounts for roughly 8% of global CO2 emissions.
Post-combustion capture uses a solvent to take CO2 from the flue gas, as at Brevik, where the CO2 is liquefied, held in 5,000 cubic metres of interim storage and loaded onto ships at 800 tonnes per hour. Oxyfuel capture burns fuel in oxygen so that the flue gas is rich in CO2, as planned at Obourg with Cryocap OXY technology from Air Liquide.
Chemicals and fertiliser plants emit CO2 in a pure stream, which lowers capture cost. The Yara Sluiskil plant in the Netherlands captures about 800,000 tonnes per year, roughly half of the site emissions, for shipping to Norway.
Uses are lower-carbon cement, steel and chemicals sold under tax credit and carbon pricing frameworks.
The limits are capital cost, waste heat and energy requirements, project cancellations and the lack of transport and storage links. The period turns on whether the first plants lead to a series of final investment decisions.
Market Outlook
The cement and steel carbon capture market, covering capture plant engineering, equipment and services at cement, steel, chemicals and fertiliser sites, and excluding CO2 transport and storage, power plant capture, gas processing and direct air capture, is valued at USD 1.2–1.8 billion in 2026 and is projected to reach USD 17.46–26.19 billion by 2038, at a CAGR of 25%.
The 2026 base rests on engineering, equipment and services for capture plants in operation, in construction and in front-end design at cement, steel and chemicals sites, mainly in Europe and North America. Growth then follows final investment decisions on Padeswood, Obourg and follow-on plants, the first commercial steel plants and the spread of capture in chemicals.
The forecast is sensitive to tax credits, public funding, access to transport and storage and the demand for low-carbon materials. Regionally, Europe holds the largest base through the North Sea storage chains, followed by North America and Asia Pacific.
Scenarios
The base case assumes follow-on projects such as Padeswood and Obourg proceed and reach operation by 2030, with shared storage available. An accelerated case assumes firm tax credits and carbon prices and faster storage build-out, bringing the inflection to 2029 and lifting the 2038 value to the top of the range. A delayed case assumes further cancellations and funding gaps, moving the inflection to 2035 and holding growth at the bottom of the range.
Factors Behind Growth
Growth drivers
- Process emissions that cannot be avoided.
- Carbon prices and tax credits.
- Public funding for first plants.
- Demand for low-carbon materials.
Enablers
- Operating reference plants.
- Capture technology suppliers and engineering firms.
- Shared transport and storage hubs.
- Industry partnerships.
Restraints and barriers
- Capital cost and funding gaps.
- Project delays and cancellations.
- Waste heat and energy requirements.
- Lack of transport and storage links.
The Forces at Play
The direction of cement and steel carbon capture is set by the first commercial cement plants, tax credits and public funding, access to CO2 transport and storage, customer demand for low-carbon cement and steel, and project delays and cancellations.
Adoption Outlook
How the shift is likely to unfold across three time horizons.
The first commercial cement plants start and follow-on projects reach final investment decision.
A series of commercial cement plants operates and the first commercial steel and chemicals plants start.
Capture becomes a standard element of new and rebuilt plants.
Latest Strategic Developments
| Date | Development | Type | Significance |
|---|---|---|---|
| Jun 2025 | Heidelberg Materials inaugurates the Brevik carbon capture plant in Norway with capacity of 400,000 tonnes of CO2 per year | Plant inauguration | Starts the first commercial cement capture plant |
| Jul 2025 | The One Big Beautiful Bill Act is signed, keeping the Section 45Q credit for carbon capture in the United States | Tax policy | Keeps credit support for capture in the United States |
| Oct 2025 | Heidelberg Materials announces its final investment decision for the Padeswood plant in Wales, capturing nearly 800,000 tonnes of CO2 per year, with commissioning planned for 2029 | Investment decision | Funds the first United Kingdom commercial cement capture plant |
| Jan 2026 | Heidelberg Materials reports that the Brevik plant is operating at a capture rate of 50%, limited by available waste heat | Plant status | Shows the effect of heat supply on capture rate |
| Feb 2026 | Holcim and Air Liquide sign an agreement for 1.1 million tonnes per year of oxyfuel capture at the Obourg plant in Belgium | Technology agreement | Plans the first oxyfuel cement capture plant at scale in Belgium |
| May 2026 | The LeadIT tracker reports more than 175 cement capture projects worldwide, 12 new projects announced in 2025 and less than 2% of the sector footprint covered by 2035 | Sector tracker | Shows that planned capture remains small against cement emissions |
Key Players & Competitive Landscape
The key participants in cement and steel carbon capture include Heidelberg Materials AG, Holcim Ltd, Air Liquide SA, CRH plc, Cemex, S.A.B. de C.V., Taiheiyo Cement Corporation, ArcelorMittal S.A., Tata Steel Limited, Nippon Steel Corporation, Yara International ASA, BASF SE, Dow Inc., Mitsubishi Heavy Industries, Ltd., SLB, Carbon Clean Solutions Limited, Svante Inc., Honeywell International Inc., Linde plc, Worley Limited, Equinor ASA, Shell plc, TotalEnergies SE, Eni S.p.A., Fluor Corporation, Technip Energies N.V., Baker Hughes Company, Aker Solutions ASA, UltraTech Cement Limited, Votorantim Cimentos S.A., Buzzi S.p.A., Titan Cement International S.A., Ørsted A/S, POSCO Holdings Inc., Baowu Steel Group Corporation Limited, thyssenkrupp AG, SSAB AB, Lhoist, Antwerp@C, HyNet North West, Northern Lights, LeadIT, Stockholm Environment Institute and Global Cement and Concrete Association.
The brief profiles representative participants in each archetype and assesses which are positioned to lead as plants move from the first wave to a series.
Heidelberg Materials, Holcim and Air Liquide lead among cement producers and suppliers with named projects, Yara leads among chemicals producers with a plant in operation, and Mitsubishi Heavy Industries, SLB and Carbon Clean lead among capture technology suppliers. Competitive intensity is low, since few plants operate, and rising as engineering firms and gas companies offer standard capture units.
| Archetype | Representative players | Position | Outlook |
|---|---|---|---|
| Cement producers | Heidelberg Materials, Holcim, CRH, Cemex, Taiheiyo Cement, UltraTech Cement, Votorantim Cimentos, Buzzi, Titan Cement International | Plants in operation and in planning | Build capture on kilns |
| Steel producers | ArcelorMittal, Tata Steel, Nippon Steel, POSCO, Baowu Steel, thyssenkrupp, SSAB | Pilots and studies | Test capture on steel sites |
| Chemicals and fertiliser producers | Yara, BASF, Dow, Ørsted | Capture on pure CO2 streams | Capture and ship CO2 |
| Capture technology suppliers | Mitsubishi Heavy Industries, SLB, Carbon Clean Solutions, Svante, Honeywell, Air Liquide, Linde, Baker Hughes | Solvent, oxyfuel and sorbent systems | Supply capture technology |
| Engineering firms and energy companies | Worley, Fluor, Technip Energies, Aker Solutions, Equinor, Shell, TotalEnergies, Eni | Front-end design and storage chains | Design plants and provide storage |
| Associations and research groups | LeadIT, Stockholm Environment Institute, Global Cement and Concrete Association | Trackers and policy | Publish data and shape policy |
Where value migrates.
In 2026 value sits with producers and suppliers that have plants in operation or in construction, because references decide who wins the next projects. By 2032 it moves toward engineering firms and standard capture units, as a series of plants replaces one-off designs. By 2038 it settles with integrated offers that combine capture, storage and low-carbon products sold at a premium. Margins hold for suppliers with proven plants and narrow for those competing for projects without funding.
Who Will Win — and Why
The archetypes best positioned to capture value as the shift matures.
Firms that have operating experience and data on capture rate and cost.
Firms with capture units running at several sites.
Firms that secure public funding and storage before final investment decision.
Regulatory Landscape
| Jurisdiction | Milestone | Indicative timing | Effect on adoption |
|---|---|---|---|
| United States | Section 45Q credit for carbon capture kept under the One Big Beautiful Bill Act | Signed July 2025 | Supports capture projects |
| Norway | Longship programme, with the Brevik plant inaugurated in June 2025 and a funding model that covered more than 80% of capital costs | In operation | Funds the first commercial plant |
| United Kingdom | Padeswood plant connected to storage in Liverpool Bay through HyNet North West | Final investment decision October 2025 | Supports the first United Kingdom cement plant |
| Belgium | Obourg plant planned with export through a hub such as Antwerp@C, with final investment decision pending public support | Pending | Depends on infrastructure rules and derisking |
| Canada | Edmonton CCS Project of about 1 million tonnes per year planned for late 2026 | Planned | Adds a large North American plant |
Investment Signals
The signals converge on a first plant and a pipeline of projects. Brevik in operation, Padeswood approved, Obourg planned and more than 175 tracked projects support growth, while a 50% capture rate, cancelled projects and funding gaps limit the pace.
Structural limits show where progress could slow: waste heat, funding, storage links and cancellations. The brief therefore tracks four indicators: plants in operation, final investment decisions, capture rate achieved and CO2 contracted for storage.
Cement first, then chemicals and fertiliser, then steel are the expected order of adoption.
Questions This Brief Answers
Strategic Implications
- Producers: sequence projects with storage availability, secure public funding and plan heat supply for capture.
- Technology suppliers: build references, publish operating data and offer standard units.
- Engineering firms: develop standard designs that cut cost and schedule.
- Governments and regulators: keep tax credits stable and speed funding and storage links.
- Investors and lenders: back plants with funding and storage contracts and treat cancellation risk as the main risk.
"The first cement plant is capturing CO2. The next twelve years decide whether the sector builds the second, third and fourth."
Table of Contents
Access & Licensing
A focused foresight brief, priced to circulate. Every option is delivered instantly and backed by analyst support.
every brief