Next™ BriefScrap-Based Steel and the Future of Electric Arc Furnaces
Buy Now
Meticulous Next™Chemicals and MaterialsOct 2026104 ppMRN-1269

Electric arc furnace steel Market Outlook 2026–2036: Growth Drivers, Key Companies, Strategic Developments & Adoption Forecast — A Meticulous Next™ Foresight Brief

Brief ID: MRN-1269Format: PDF + Summary DeckDelivery: InstantHorizon: 10-yr horizonSignal: Accelerating
Buy Now · $950
Adoption maturity (indexed)
Mainstream inflection: ~2032
Horizon: 2026–2036 · Signal: Accelerating
10 yrs
Forward horizon
~2032
Mainstream inflection
Accelerating
Signal strength

What This Brief Covers

This Meticulous Next™ brief examines electric arc furnace steelmaking, which melts scrap and iron units with electricity, and the capacity additions that are replacing blast furnaces in Europe and the United States. It tests how fast new furnaces displace blast furnace output, and which participants capture value among steelmakers, equipment suppliers, electrode makers and power suppliers.

The first signal is scale. The United States Geological Survey reports world raw steel production of about 1.9 billion tonnes in 2025, and notes that US electric arc furnace steel came from 47 companies operating 102 minimills. The conclusion is that the United States already runs mainly on electric arc capacity, while Europe is only now beginning the shift.

The second signal is European commitment. In February 2026 ArcelorMittal confirmed a 1.3 billion euro, 2-million-tonne electric arc furnace at Dunkirk, due in 2029, with about half of the investment covered by French energy efficiency certificates and a long-term low-carbon power contract with EDF. The conclusion is that policy support and trade protection are now large enough to trigger investment.

The third signal is closure. HKM in Duisburg tapped its blast furnace A for the last time on 19 September 2026 after more than 53 years, with construction of an electric arc furnace of up to 2.5 million tonnes starting in August 2026 and supported by 200 million euros of public funds. The conclusion is that blast furnace retirement is no longer a plan but an event, although pig iron output continues from the remaining furnace until 2029.

Limits remain. The Dunkirk furnace will use about 60 percent scrap with the rest from direct reduced iron and blast furnace hot metal, so emissions fall by about two thirds, not to near zero. The brief therefore treats electric arc capacity as the first and largest step in steel decarbonization, with iron supply as the constraint, and uses a ten year horizon to 2036.

It is a focused 104-page decision brief for steelmakers, equipment and electrode suppliers, utilities and investors. It presents an indicative trajectory rather than a segmented market model. Its purpose is to identify which investments proceed first, who captures value, and which indicators to track.

Brief Snapshot
ParameterDetails
Forward horizon2026–2036 (10 years)
Emerging forceElectric arc furnace steel: EAF capacity additions replacing blast furnaces in Europe and the US
Technology readinessMature technology; large-scale European conversions under construction
Indicative market size & forecastThe electric arc furnace steel market, covering electric arc furnace systems, graphite electrodes, refractories and power equipment for new and rebuilt capacity, is valued at USD 9–13 billion in 2026 and is projected to reach USD 19.4–28.1 billion by 2036, at a CAGR of 8%
Mainstream inflection~2032, when European blast furnace replacement furnaces are operating at scale
Signal strengthEUR 1.3 billion Dunkirk furnace confirmed February 2026; Duisburg blast furnace A closed September 2026
Primary beneficiariesSteelmakers with scrap access and clean power; furnace and electrode suppliers; utilities with long-term power contracts
Brief length / format104 pages · PDF + executive summary deck · instant delivery

Understanding the Technology

The furnace is the first layer. Electric arcs between graphite electrodes melt scrap and iron units in large steel vessels.

The feed is the second layer. Scrap, direct reduced iron, hot briquetted iron and some liquid pig iron make up the charge.

The power is the third layer. Large grid connections and long-term low-carbon electricity contracts decide cost and emissions.

The refining is the fourth layer. Ladle furnaces and casting make flat and long products to final grades.

The limits are scrap quality, iron supply, grid capacity and electricity price. The decade turns on whether iron units and power are secured for the new furnaces.

Market Outlook

The electric arc furnace steel market, covering electric arc furnace systems, graphite electrodes, refractories and power equipment for new and rebuilt capacity, is valued at USD 9–13 billion in 2026 and is projected to reach USD 19.4–28.1 billion by 2036, at a CAGR of 8%, and excluding steel sold by electric arc steelmakers.

The 2026 base rests on furnace systems, electrodes, refractories and power equipment for new and rebuilt electric arc capacity. From that base, growth follows the number of blast furnaces replaced, scrap collection and the pace of grid connections.

The forecast is sensitive to electricity price, scrap availability and trade protection. Regionally, Europe leads on blast furnace replacement, North America on installed electric arc capacity, and Asia on scrap growth and new builds.

Scenarios

The base case assumes announced European furnaces start by 2029 and further conversions follow, giving the inflection in 2032. An accelerated case assumes lower power prices and stronger trade protection, bringing the inflection to 2030 and lifting the 2036 value to the top of the range. A delayed case assumes power cost or financing delays slow new projects, holding growth at the bottom of the range.

Factors Behind Growth

Growth drivers

  • Carbon pricing and border measures in Europe.
  • Public funding for steel decarbonization.
  • Ageing blast furnaces needing relining or closure.
  • Growing availability of scrap.

Enablers

  • Long-term low-carbon electricity contracts.
  • Large furnace systems of 2 million tonnes or more.
  • Direct reduced iron and hot briquetted iron supply.
  • Trade protection against imports.

Restraints and barriers

  • Electricity price and grid capacity.
  • Scrap quality and iron unit supply.
  • Remaining emissions from blast furnace hot metal.
  • Capital cost and workforce transition.

The Forces at Play

Five converging forces will determine how electric arc steel evolves.

Adoption Outlook

How the shift is likely to unfold across three time horizons.

Near term2026–2029
Construction

Dunkirk and Duisburg furnaces are built; blast furnaces continue in parallel.

Mid term2029–2032
Start-up

Replacement furnaces start and blast furnace output falls.

Long term2032–2036
Iron supply

Direct reduced iron and scrap supply decide further displacement.

Latest Strategic Developments

DateDevelopmentTypeSignificance
Feb 2026ArcelorMittal confirms construction of a 2-million-tonne electric arc furnace at Dunkirk, France, a EUR 1.3 billion investment due in 2029InvestmentStarts large European conversion
Aug 2026Construction begins on an electric arc furnace of up to 2.5 million tonnes at HKM in Duisburg, Germany, due in 2029ConstructionBuilds the largest furnace in Germany
Sep 2026HKM permanently shuts blast furnace A in Duisburg after more than 53 yearsClosureRetires blast furnace capacity
Sep 2026Google agrees to buy environmental attribute certificates for up to 91,000 tonnes of steel from StegraOfftakeSupports low-carbon steel demand

Key Players & Competitive Landscape

The key participants in electric arc furnace steel include ArcelorMittal S.A., Salzgitter AG, HKM Hüttenwerke Krupp Mannesmann GmbH, thyssenkrupp Steel Europe AG, Nucor Corporation, Cleveland-Cliffs Inc., Steel Dynamics, Inc., Commercial Metals Company, Stegra, SSAB AB, Tata Steel Limited, Voestalpine AG, Danieli and C. Officine Meccaniche S.p.A., SMS group GmbH, Primetals Technologies Limited, Tenova S.p.A., GrafTech International Ltd., Showa Denko Carbon Group, Électricité de France S.A., Gerdau S.A., Celsa Group, Riva Group, Outokumpu Oyj, Acerinox S.A., Feralpi Group, Arvedi Group, Nippon Steel Corporation, POSCO Holdings Inc., JFE Steel Corporation, Hyundai Steel Company, Baowu Steel Group, JSW Steel Limited, Ternium S.A., Big River Steel, North Star BlueScope Steel, Evraz North America, Algoma Steel Group Inc., Stelco Holdings Inc., Sidenor, Swiss Steel Group, Google LLC, Microsoft Corporation, RWE AG, Vattenfall AB, Government of Germany, Government of France, European Commission and United States Geological Survey.

The brief profiles representative participants in each archetype and assesses which are positioned to lead as electric arc capacity replaces blast furnaces.

The competitive landscape is forming around six archetypes. Integrated steelmakers converting to electric arc. Established electric arc and minimill producers. Furnace and equipment suppliers. Electrode and consumable makers. Power suppliers and buyers. Governments and agencies. Competitive intensity is high in 2026 because converting producers compete with established minimills for scrap and power.

ArchetypeRepresentative playersPosition in 2026Outlook to 2036
Integrated steelmakers converting to electric arcArcelorMittal, Salzgitter, HKM, thyssenkrupp Steel Europe, Tata Steel, SSAB, Voestalpine, Nippon Steel, POSCO, JFE Steel, Hyundai Steel, Baowu, JSW Steel, Algoma Steel, Stelco, Cleveland-CliffsFlat steelReplace blast furnaces
Established electric arc and minimill producersNucor, Steel Dynamics, Commercial Metals, Gerdau, Celsa, Riva, Feralpi, Arvedi, Ternium, Big River Steel, North Star BlueScope, Outokumpu, Acerinox, Sidenor, Swiss Steel, Evraz North America, StegraLong and flat steelCompete for scrap and power
Furnace and equipment suppliersDanieli, SMS group, Primetals Technologies, TenovaFurnaces and ladle systemsSupply the furnace plants
Electrode and consumable makersGrafTech, Showa Denko Carbon GroupGraphite electrodesSupply consumables
Power suppliers and buyersÉlectricité de France, RWE, Vattenfall, Google, MicrosoftElectricity and steel offtakeSecure power and buy low-carbon steel
Governments and agenciesGovernment of Germany, Government of France, European Commission, United States Geological SurveyFunding and dataFund projects and set rules

Where value migrates.

In 2026 value sits with equipment suppliers and with converting steelmakers that secure public funding and power contracts. By 2032 it moves toward producers with assured scrap, iron units and clean power, because those inputs decide margin. By 2036 it settles in producers with low-carbon iron supply and in suppliers of electrodes and grid equipment. Margins hold for producers with secured power and narrow for those exposed to spot electricity and scrap prices.

Who Will Win — and Why

The archetypes best positioned to capture value as the shift matures.

Steelmakers with secured power and iron supply

Firms that control the main cost inputs.

Furnace and electrode suppliers

Firms that benefit from a build cycle.

Utilities with long-term clean power contracts

Firms that serve large new loads.

Regulatory Landscape

JurisdictionMilestoneIndicative timingEffect on adoption
EU Carbon Border Adjustment MechanismEU levy on embedded emissions in imported steelIn forceProtects European low-carbon steel
EU Emissions Trading SystemEU carbon price on industrial emissionsIn forceRaises cost of blast furnace steel
EU steel safeguard tariff-rate quota reformEU measure on steel import volumesDevelopingSupports European producers
German federal and state steel fundingPublic funding for steel decarbonization projectsIn forceFunds the Duisburg furnace
French energy efficiency certificatesFrench scheme financing about half of the Dunkirk furnaceIn forceFunds the Dunkirk furnace

Investment Signals

The signals converge on a European build cycle beginning in 2026. A 1.3 billion euro furnace was confirmed at Dunkirk, a blast furnace was closed at Duisburg and a larger furnace is under construction, and low-carbon steel offtakes are appearing. Each signal supports growth, and projects still depend on public funding and power contracts.

Structural limits show where the shift could slow: electricity price, scrap and iron unit supply, remaining blast furnace hot metal and capital cost. The brief therefore tracks four indicators: furnace start-ups, blast furnace closures, power contract prices and direct reduced iron supply.

Regionally, Europe leads on blast furnace replacement, North America on installed capacity and Asia on scrap growth and new builds. New furnace construction, then blast furnace retirement, then low-carbon iron supply are the expected order of development.

Questions This Brief Answers

01What is electric arc furnace steel, and why does it matter?
02What is the market size in 2026, and what is the forecast to 2036?
03What do the investment and closure signals indicate?
04What factors are driving growth, and what power, scrap and iron barriers remain?
05Which key participants are active, and which archetypes are positioned to win?
06What are the latest developments?
07How will carbon and trade policy shape the shift between 2026 and 2036?
08What should steelmakers, suppliers and utilities do now?

Strategic Implications

  • Integrated steelmakers: set firm blast furnace retirement dates and secure power and iron supply.
  • Established electric arc producers: lock in scrap and power ahead of converting competitors.
  • Equipment and electrode suppliers: plan capacity for the 2026 to 2029 build cycle.
  • Utilities and governments: align grid connections and funding with furnace schedules.
  • Investors: treat start-ups, closures, power prices and iron supply as the leading indicators.
Analyst Perspective

"One furnace does not make a climate strategy. The electric arc build cycle is the first step, and iron and power supply decide how far it goes."

Lead Foresight Analyst
Advanced Materials · Meticulous Next™

Table of Contents

Access & Licensing

A focused foresight brief, priced to circulate. Every option is delivered instantly and backed by analyst support.

Single Brief
$950
One named user
Full PDF brief
Executive summary deck
One named user
Free outlook update
★ Most Popular
Team License
$1,350
Up to 10 users
Access for 2–10 users
Internal sharing rights
30-minute analyst briefing
Enterprise
$2,150
Organization-wide
Organization-wide access
Unlimited users
Priority analyst access
Custom extracts
Included with
every brief
Analyst-reviewed foresightMulti-signal validationInstant deliveryFree outlook updates