Battery electric multiple units Market Outlook 2026–2038: Growth Drivers, Key Companies, Strategic Developments & Adoption Forecast — A Meticulous Next™ Foresight Brief
What This Brief Covers
This Meticulous Next™ brief examines battery electric multiple units and hydrogen trains, meaning passenger trains that run on stored power instead of diesel on lines without overhead wires. It tests whether battery trains become the default for non-electrified routes and how much room remains for hydrogen.
Battery trains are being ordered in series. Iarnród Éireann chose Alstom in December 2021 for 19 five-carriage trains, ordered 18 more in December 2022 and 20 more in December 2025, a total of 57 units with an 80 kilometre range that holds even at the end of battery life. The conclusion is that a framework of up to 750 carriages gives a single operator enough volume to settle the design, although the first trains slipped from 2026 to the second quarter of 2027 because of battery issues.
Hydrogen has met reliability limits. The Rhein-Main-Verkehrsverbund withdrew its fleet of 18 Coradia iLint trains after repeated fuel cell faults, the operator EVB had only 4 of 14 units in service in August 2025 after replacement fuel cell modules failed to arrive, and Alstom paused hydrogen train development after France withdrew funding and its chief executive called the technology not yet mature. The conclusion is that hydrogen trains face supply and reliability risks that battery trains avoid on shorter routes.
North America shows the same split in orders. Stadler agreed to supply eight battery electric trains to Metra in February 2024, Keolis issued a request for proposals for seven battery electric trains for the Fairmount line of the Massachusetts Bay Transportation Authority in January 2025, and California holds a contract for up to 29 Stadler hydrogen trains. The conclusion is that commuter operators are adding battery trains where lines are short or partly electrified, while hydrogen is confined to a small number of long lines.
The brief treats battery electric multiple units as an accelerating signal with a twelve year horizon to 2038. It identifies which train types, regions and companies move first and what each means for rail operators and suppliers. It is a focused 108-page decision brief that presents an indicative trajectory rather than a segmented market model.
| Parameter | Details |
|---|---|
| Forward horizon | 2026–2038 (12 years) |
| Emerging force | Battery and hydrogen trains: battery electric train orders for non-electrified routes |
| Technology readiness | Battery electric trains in series production with ranges of about 80 kilometres; hydrogen trains in service but with fleet withdrawals and supply problems |
| Indicative market size & forecast | The battery electric multiple units market, covering battery electric and hydrogen fuel cell trains, battery and fuel cell traction systems, and charging and refuelling infrastructure for non-electrified lines, and excluding diesel trains, conventional electric trains and catenary electrification, is valued at USD 3.0–4.5 billion in 2026 and is projected to reach USD 11.69–17.53 billion by 2038, at a CAGR of 12% |
| Mainstream inflection | ~2031, when battery trains are the default choice for new orders on non-electrified regional lines |
| Signal strength | 57 battery electric trains ordered by one operator, framework orders of up to 750 carriages, and hydrogen fleets withdrawn or delayed in Germany |
| Primary beneficiaries | Manufacturers with framework orders; suppliers of proven battery packs; operators with partly electrified lines |
| Brief length / format | 108 pages · PDF + executive summary deck · instant delivery |
Understanding the Technology
A battery train carries lithium-ion packs under the floor or on the roof and recharges from overhead wires on electrified sections or at stations. A hydrogen train carries tanks and a fuel cell that produces electricity on board, with a small battery to handle peaks.
Range sets where each fits. The Irish Rail units carry batteries of 840 kilowatt hours for an 80 kilometre range, which covers short unwired branches and gaps in a partly electrified network, whereas long lines without wires need more energy than a battery pack can carry. The conclusion is that battery trains win where a line can be partly electrified or charged at stations, and hydrogen is considered where it cannot.
Hydrogen supply is the weak point. Fleets in Germany have faced hydrogen resupply difficulties and fuel cell module shortages, and an operator reverted to diesel for part of its service. The conclusion is that reliability of supply, not the train itself, limits how fast hydrogen can scale.
Uses are regional and commuter passenger services on lines without overhead wires, short unwired gaps in electrified networks and branch lines.
The limits are battery delays, range, fuel cell reliability, hydrogen supply and withdrawn public funding. The period turns on whether the first large battery fleets enter service on time.
Market Outlook
The battery electric multiple units market, covering battery electric and hydrogen fuel cell trains, battery and fuel cell traction systems, and charging and refuelling infrastructure for non-electrified lines, and excluding diesel trains, conventional electric trains and catenary electrification, is valued at USD 3.0–4.5 billion in 2026 and is projected to reach USD 11.69–17.53 billion by 2038, at a CAGR of 12%.
The 2026 base rests on battery and hydrogen trains in service and on order in Europe, plus first orders in North America and Japan. Growth then follows the delivery of framework orders, the phase-out of diesel trains and partial electrification of lines that make battery operation possible.
The forecast is sensitive to battery performance, hydrogen supply, public funding and delivery schedules. Regionally, Europe holds the largest base, followed by North America and Asia Pacific.
Scenarios
Scenarios.
The base case assumes delivery of the large battery fleets by 2028 and growing framework orders, bringing the inflection to about 2031. An accelerated case assumes faster diesel phase-out and wider station charging, bringing the inflection to 2029 and lifting the 2038 value to the top of the range. A delayed case assumes continued battery delays and limited funding, moving the inflection to 2034 and holding growth at the bottom of the range.
Factors Behind Growth
Growth drivers
- Diesel phase-out targets.
- Lower cost than full electrification.
- Operating experience from first fleets.
- Public funding for rolling stock.
Enablers
- Battery energy density.
- Framework orders.
- Partial electrification and station charging.
- Fuel cell module supply.
Restraints and barriers
- Battery delays and range limits.
- Hydrogen supply and fuel cell failures.
- Withdrawn funding for hydrogen development.
- Long approval and delivery times.
The Forces at Play
The direction of battery electric multiple units is set by diesel phase-out commitments, battery cost and range gains, hydrogen supply setbacks, partial electrification of lines and public funding for rolling stock.
Adoption Outlook
How the shift is likely to unfold across three time horizons.
Ordered battery fleets enter service and hydrogen fleets are reviewed after reliability problems.
Battery trains become the default choice for regional lines and hydrogen holds a small niche.
Most remaining non-electrified passenger lines are served by battery trains.
Latest Strategic Developments
| Date | Development | Type | Significance |
|---|---|---|---|
| Feb 2024 | Stadler agrees to supply eight battery electric trains to Metra in Chicago | Order | Adds battery trains to a large US commuter system |
| Nov 2024 | A Stadler hydrogen train begins testing on the Metrolink line between San Bernardino and Redlands in California | Trial | Starts hydrogen testing on a US commuter line |
| Jan 2025 | Keolis issues a request for proposals for seven battery electric trains for the Fairmount line of the Massachusetts Bay Transportation Authority | Tender | Opens a battery train order in Boston |
| Aug 2025 | Only 4 of 14 hydrogen units of the operator EVB are in service after replacement fuel cell modules fail to arrive | Fleet problem | Shows hydrogen supply risk in Germany |
| Oct 2025 | Iarnród Éireann moves the entry into service of its battery trains to the second quarter of 2027 because of battery issues | Delay | Shows delivery risk for first large battery fleets |
| Dec 2025 | Iarnród Éireann places a third order of 20 battery electric units with Alstom, bringing the total to 57 | Order | Confirms repeat orders for battery trains |
Key Players & Competitive Landscape
The key participants in battery electric multiple units include Alstom SA, Stadler Rail AG, Siemens AG, Construcciones y Auxiliar de Ferrocarriles, S.A., Hitachi, Ltd., Hyundai Rotem Company, CRRC Corporation Limited, Westinghouse Air Brake Technologies Corporation, Patentes Talgo, S.L.U., Ballard Power Systems Inc., Deutsche Bahn AG, Iarnród Éireann, Keolis SA, Northeast Illinois Regional Commuter Railroad Corporation, Peninsula Corridor Joint Powers Board, Massachusetts Bay Transportation Authority, FNM S.p.A., East Japan Railway Company, Saft Groupe SAS, SNCF Voyageurs, Rhein-Main-Verkehrsverbund GmbH, Eisenbahnen und Verkehrsbetriebe Elbe-Weser GmbH, San Bernardino County Transportation Authority, Southern California Regional Rail Authority, Trenitalia S.p.A., Network Rail Infrastructure Limited, Merseytravel, ÖBB-Holding AG, Škoda Group a.s., PESA Bydgoszcz S.A., Toshiba Corporation, Central Japan Railway Company, Ministry of Railways of India, European Commission, French Ministry for Ecological Transition, Federal Transit Administration, California State Transportation Agency and Transport for Wales.
The brief profiles representative participants in each archetype and assesses which are positioned to lead as battery fleets are delivered.
Alstom, Stadler and Siemens lead among manufacturers with battery or hydrogen trains in service or on order, Iarnród Éireann leads among operators ordering battery trains in volume, and Ballard Power Systems leads among fuel cell suppliers named here. Competitive intensity is moderate, with a few manufacturers holding most orders.
| Archetype | Representative players | Position in 2026 | Outlook to 2038 |
|---|---|---|---|
| Rolling stock manufacturers | Alstom, Stadler, Siemens, Construcciones y Auxiliar de Ferrocarriles, Hitachi, Hyundai Rotem, CRRC, Wabtec, Talgo, Škoda Group, PESA Bydgoszcz | Battery and hydrogen trains | Build and deliver trains |
| Fuel cell and battery suppliers | Ballard Power Systems, Saft Groupe, Toshiba | Fuel cell modules and battery packs | Supply traction energy systems |
| Rail operators | Deutsche Bahn, Iarnród Éireann, Keolis, SNCF Voyageurs, East Japan Railway, Trenitalia, ÖBB-Holding, Central Japan Railway, Transport for Wales | Regional and commuter services | Order and run trains |
| Commuter and regional authorities | Northeast Illinois Regional Commuter Railroad Corporation, Peninsula Corridor Joint Powers Board, Massachusetts Bay Transportation Authority, FNM, Rhein-Main-Verkehrsverbund, Eisenbahnen und Verkehrsbetriebe Elbe-Weser, San Bernardino County Transportation Authority, Southern California Regional Rail Authority, Merseytravel | Procurement and funding | Order for regional lines |
| Infrastructure managers | Network Rail Infrastructure Limited | Electrification and charging | Provide wires and charging points |
| Governments and research bodies | European Commission, French Ministry for Ecological Transition, Federal Transit Administration, California State Transportation Agency, Ministry of Railways of India | Funding and rules | Fund trains and set rules |
Where value migrates.
In 2026 value sits with first fleets and large framework orders, mainly in Europe and North America. By 2032 it moves toward battery trains in volume, together with charging at stations and partial electrification. By 2038 it settles with battery power on most remaining non-electrified passenger lines. Margins hold for manufacturers with framework orders and proven battery packs and narrow for suppliers dependent on hydrogen fleets.
Who Will Win — and Why
The archetypes best positioned to capture value as the shift matures.
Manufacturers with repeat orders spread development cost over many units and secure delivery slots.
Suppliers whose packs meet range and life targets gain from every follow-on order.
Operators that combine battery trains with partial electrification avoid dependence on one energy source.
Regulatory Landscape
| Jurisdiction | Milestone | Indicative timing | Effect on adoption |
|---|---|---|---|
| Germany, regional rail | Hydrogen fleets withdrawn or reduced after fuel cell problems | Operating | Shifts new orders toward battery trains |
| France, hydrogen train funding | Financial support withdrawn, blocking matching European funding | Withdrawn | Pauses hydrogen train development at a main manufacturer |
| Ireland, DART programme | Framework for up to 750 carriages with 57 units ordered | In force | Largest battery train framework in the brief |
| United States, commuter rail | Battery train orders by Metra and tender by Keolis for Boston | Developing | Opens a North American market |
| Italy, FNM framework | Up to 14 Coradia Stream H hydrogen trains under a framework agreement | In force | Keeps hydrogen orders alive in selected regions |
Investment Signals
The signals converge on battery trains. Repeat orders from Irish Rail, orders in Chicago and a tender in Boston support growth, while battery delays, hydrogen reliability problems and withdrawn funding limit the pace of hydrogen.
Structural limits show where progress could slow: battery range, delivery schedules, hydrogen supply and public funding. The brief therefore tracks four indicators: battery trains ordered, trains delivered on schedule, hydrogen units in service and kilometres electrified in part.
Delivery of the first large battery fleets, then repeat orders in other regions, then battery trains as the default for non-electrified lines are the expected order of adoption.
Questions This Brief Answers
Strategic Implications
- Rail operators: choose battery trains for lines that can be partly electrified or charged at stations and hold hydrogen for long unwired lines.
- Manufacturers: secure battery pack supply and deliver the first large fleets on schedule.
- Fuel cell suppliers: raise module reliability and secure hydrogen supply arrangements with operators.
- Governments and infrastructure managers: fund rolling stock together with station charging and partial electrification.
- Investors: favour manufacturers with framework orders and suppliers with proven battery packs.
"Battery trains are being ordered by the dozen. The next twelve years decide how much room hydrogen keeps."
Table of Contents
Access & Licensing
A focused foresight brief, priced to circulate. Every option is delivered instantly and backed by analyst support.
every brief