Advanced thermal treatment Market Outlook 2026–2036: Growth Drivers, Key Companies, Strategic Developments & Adoption Forecast — A Meticulous Next™ Foresight Brief
What This Brief Covers
This Meticulous Next™ brief examines advanced thermal treatment, meaning energy-from-waste incineration, gasification and pyrolysis plants that treat residual municipal waste and recover power, heat and materials. It tests whether landfill diversion rules lead to new plant capacity where it is needed, and which operators, builders and municipalities gain.
Landfill remains large in parts of Europe. About 49.5 million tonnes of municipal waste went to landfill in Europe in 2024, which is 22.5% of treated waste, and Romania, Greece, Malta, Cyprus and Bulgaria send 70% to 80% of their waste to landfill. The conclusion is that the EU target of 10% landfilling by 2035 requires new treatment capacity in a defined group of countries, and growth is concentrated there.
Overcapacity elsewhere limits the wider market. A study by Zero Waste Europe in October 2026 finds about 65 million tonnes of incineration overcapacity in the EU and recommends a moratorium on new capacity. The conclusion is that new plants outside the landfill-heavy countries face public and policy resistance, and the market depends on matching plants to the places that still landfill.
Plants are also moving toward lower emissions. Europe has about 500 waste-to-energy plants that produced energy equal to 15.7 billion cubic metres of natural gas in 2024, Amager Bakke in Copenhagen is piloting carbon capture, and lawmakers are still deciding how to bring waste incineration into the EU emissions trading system. The conclusion is that carbon cost and capture decide the long-term economics of plants.
The brief treats advanced thermal treatment as an accelerating signal with a ten year horizon to 2036. It identifies which technologies, countries and companies move first and what each means for municipalities, operators and suppliers. It is a focused 99-page decision brief that presents an indicative trajectory rather than a segmented market model.
| Parameter | Details |
|---|---|
| Forward horizon | 2026–2036 (10 years) |
| Emerging force | Waste-to-energy: landfill diversion rules driving incineration and gasification |
| Technology readiness | Energy-from-waste incineration is mature with about 500 plants in Europe; gasification and pyrolysis at early commercial scale; carbon capture in pilot |
| Indicative market size & forecast | The advanced thermal treatment market, covering the construction, equipment and operation of energy-from-waste incineration, gasification and pyrolysis plants that treat municipal and residual waste, and excluding landfill gas capture, anaerobic digestion, recycling and hazardous waste incineration, is valued at USD 40–50 billion in 2026 and is projected to reach USD 71.63–89.54 billion by 2036, at a CAGR of 6% |
| Mainstream inflection | ~2030, when plants planned in landfill-heavy countries are commissioned and the treatment of waste incineration under emissions trading is settled |
| Signal strength | 49.5 million tonnes of municipal waste landfilled in Europe in 2024 against an EU landfill target of 10% by 2035 |
| Primary beneficiaries | Operators with concession portfolios; technology suppliers with references; developers with carbon capture |
| Brief length / format | 99 pages · PDF + executive summary deck · instant delivery |
Understanding the Technology
Advanced thermal treatment burns, gasifies or pyrolyses residual waste that cannot be recycled and recovers the energy as electricity, heat or fuel. Modern plants clean the flue gas, recover metals from the ash and supply district heating.
Energy-from-waste incineration is the mature route. Europe has about 500 plants, and the Amager Bakke plant in Copenhagen, owned by Amager Resource Center, supplies low-carbon power to about 550,000 people and district heating to about 140,000 households, and recovers 90% of the metals it collects.
Gasification and pyrolysis convert waste into gas or oil for power, chemicals or fuels, and are at an earlier commercial stage with fewer references.
Uses are residual waste treatment for municipalities, with heat and power sold to networks and metals and ash recovered.
The limits are overcapacity in several markets, public opposition, emissions trading costs and recycling targets. The period turns on whether new plants are built where landfilling remains high and how carbon cost is applied.
Market Outlook
The advanced thermal treatment market, covering the construction, equipment and operation of energy-from-waste incineration, gasification and pyrolysis plants that treat municipal and residual waste, and excluding landfill gas capture, anaerobic digestion, recycling and hazardous waste incineration, is valued at USD 40–50 billion in 2026 and is projected to reach USD 71.63–89.54 billion by 2036, at a CAGR of 6%.
The 2026 base rests on the construction, equipment and operation of thermal treatment plants in Europe, Asia Pacific and North America, with Europe holding a large base through about 500 plants. Growth then follows plants planned in landfill-heavy countries such as Greece, the spread of carbon capture and the build-out of advanced thermal routes.
The forecast is sensitive to landfill and recycling targets, the treatment of waste incineration in emissions trading, public acceptance and plant overcapacity. Regionally, Europe and Asia Pacific hold the largest bases, followed by North America.
Scenarios
The base case assumes plants planned in landfill-heavy countries are commissioned by 2030 and the treatment of waste incineration under emissions trading is settled. An accelerated case assumes strict enforcement of landfill limits and carbon capture support, bringing the inflection to 2028 and lifting the 2036 value to the top of the range. A delayed case assumes a moratorium on new capacity and slow permitting, moving the inflection to 2033 and holding growth at the bottom of the range.
Factors Behind Growth
Growth drivers
- Landfill diversion rules.
- Landfill methane and land constraints.
- Energy and district heat demand.
- Municipal and utility investment.
Enablers
- Proven plant designs.
- Concession and public-private models.
- District heating networks.
- Metal and residue recovery.
Restraints and barriers
- Overcapacity in several European markets.
- Public opposition and permitting.
- Emissions trading costs.
- Recycling and prevention targets.
The Forces at Play
The direction of advanced thermal treatment is set by landfill diversion targets, recycling targets and residual waste volumes, emissions trading for waste incineration, overcapacity in leading markets and carbon capture at waste plants.
Adoption Outlook
How the shift is likely to unfold across three time horizons.
Tenders in landfill-heavy countries proceed and carbon capture pilots operate at plants.
New plants are commissioned and the cost of emissions trading is settled for waste incineration.
Thermal treatment becomes the standard route for residual waste that cannot be recycled.
Latest Strategic Developments
| Date | Development | Type | Significance |
|---|---|---|---|
| Jun 2025 | Greece plans six waste-to-energy plants with combined capacity of 1.19 million tonnes per year and investment of about EUR 1 billion | National plan | Targets the EU landfill limit in a landfill-heavy country |
| Aug 2026 | An analysis of European waste-to-energy finds that about 500 plants produced energy equal to 15.7 billion cubic metres of natural gas in 2024 | Sector analysis | Sizes the energy contribution of existing plants |
| Oct 2026 | Zero Waste Europe finds about 65 million tonnes of incineration overcapacity in the EU and recommends a moratorium on new capacity | Policy study | Raises policy resistance to new incinerators |
Key Players & Competitive Landscape
The key participants in advanced thermal treatment include Veolia Environnement SA, Covanta Holding Corporation, Hitachi Zosen Corporation, China Everbright Environment Group Limited, Beijing Enterprises Holdings Limited, Keppel Corporation Limited, Fortum Oyj, Amager Resource Center, EEW Energy from Waste GmbH, Remondis SE & Co. KG, Renewi plc, Babcock & Wilcox Enterprises, Inc., Mitsubishi Heavy Industries, Ltd., Andritz AG, Valmet Oyj, Enerkem Inc., Metlen Energy & Metals plc, Public Power Corporation S.A., Sembcorp Industries Ltd, Doosan Enerbility Co., Ltd., GEK Terna, Aktor, Motor Oil (Hellas) Corinth Refineries S.A., Mesogeos, Martin GmbH, Wheelabrator, Viridor, Biffa plc, FCC Servicios Medio Ambiente, Vattenfall AB, Ørsted A/S, Waste Management, Inc., Shanghai Environment Group Co., Ltd., Grandblue Environment Co., Ltd., SLB Capturi, Aker Carbon Capture, Eurostat, Zero Waste Europe, Confederation of European Waste-to-Energy Plants, European Commission, World Economic Forum and United States Environmental Protection Agency.
The brief profiles representative participants in each archetype and assesses which are positioned to lead as plants are tendered and carbon cost is settled.
Veolia, Covanta and China Everbright lead among plant owners and operators, Hitachi Zosen, Babcock & Wilcox and Andritz lead among builders and technology suppliers, and Enerkem leads among advanced thermal developers. Competitive intensity is high in mature markets with overcapacity and lower in landfill-heavy countries where tenders are only beginning.
| Archetype | Representative players | Position in 2026 | Outlook to 2036 |
|---|---|---|---|
| Plant owners and operators | Veolia, Covanta, China Everbright Environment, Beijing Enterprises, Keppel, Fortum, Amager Resource Center, EEW Energy from Waste, Remondis, Renewi, Wheelabrator, Viridor, Biffa, FCC Servicios Medio Ambiente, Shanghai Environment Group, Grandblue Environment, Sembcorp | Concessions and plant portfolios | Own and run plants |
| Plant builders and technology suppliers | Hitachi Zosen, Mitsubishi Heavy Industries, Babcock & Wilcox, Andritz, Valmet, Doosan Enerbility, Martin | Furnaces, boilers and flue gas cleaning | Design and build plants |
| Advanced thermal developers | Enerkem | Gasification and pyrolysis plants | Develop new thermal routes |
| Utilities and energy companies | Fortum, Vattenfall, Ørsted, Public Power Corporation, Metlen Energy & Metals, Motor Oil | Heat, power and project interest | Buy heat and power and invest in projects |
| Carbon capture suppliers | SLB Capturi, Aker Carbon Capture | Capture units for waste plants | Supply capture technology |
| Associations, regulators and research groups | Confederation of European Waste-to-Energy Plants, European Commission, Eurostat, Zero Waste Europe, United States Environmental Protection Agency, World Economic Forum | Rules, data and analysis | Set rules and publish data |
Where value migrates.
In 2026 value sits with operators that hold plants and long waste and heat contracts, because gate fees and energy sales come from them. By 2031 it moves toward builders active in landfill-heavy markets and suppliers of carbon capture, as new plants are commissioned and carbon cost applies. By 2036 it settles with integrated groups that combine waste collection, treatment, heat and carbon management. Margins hold for operators with long concessions and narrow for merchant plants that depend on spot waste prices.
Who Will Win — and Why
The archetypes best positioned to capture value as the shift matures.
Firms that hold long waste supply and heat contracts.
Firms that have built plants at scale in several countries.
Firms that combine waste treatment with proven capture units.
Regulatory Landscape
| Jurisdiction | Milestone | Indicative timing | Effect on adoption |
|---|---|---|---|
| European Union, landfill target | Municipal waste sent to landfill to fall to 10% or less of the total generated by 2035 | Target to 2035 | Requires new treatment capacity in landfill-heavy countries |
| European Union, recycling target | Recycling of 55% of municipal waste by 2035 | Target to 2035 | Reduces residual waste available for thermal treatment |
| European Union, emissions trading | Treatment of waste incineration under the emissions trading system is still being decided | Under discussion | Determines the carbon cost of plants |
| Greece | Plan for six plants with combined capacity of 1.19 million tonnes per year, with a competitive process planned for 2026 and three years of construction | Planned | Targets the landfill limit in a country that landfills 70% to 80% of waste |
| European Union, civil society | Study by Zero Waste Europe recommending a moratorium on new incineration capacity | Published October 2026 | Raises resistance to new plants |
Investment Signals
The signals converge on a divided market. Landfilling of 49.5 million tonnes in 2024, a 10% landfill target by 2035 and plans such as those of Greece support growth in landfill-heavy countries, while about 65 million tonnes of overcapacity, an open emissions trading decision and high recycling targets limit growth elsewhere.
Structural limits show where progress could slow: overcapacity, public opposition, carbon cost and recycling progress. The brief therefore tracks four indicators: landfill rates by country, plants tendered and commissioned, the emissions trading decision and carbon capture projects.
Landfill-heavy countries first, then plants with carbon capture, then gasification and pyrolysis at scale are the expected order of adoption.
Questions This Brief Answers
Strategic Implications
- Municipalities and utilities: match capacity to residual waste after recycling targets, secure heat offtake and contract long concessions.
- Operators: select markets where landfilling remains high and prepare plants for carbon capture.
- Technology suppliers: build references in landfill-heavy countries and offer capture-ready designs.
- Governments and regulators: settle the emissions trading treatment early and keep landfill rules enforced.
- Investors and lenders: back plants with long waste and heat contracts and treat overcapacity and carbon cost as the main risks.
"Landfill limits create the need and overcapacity limits the supply. The next ten years decide where the plants are built."
Table of Contents
Access & Licensing
A focused foresight brief, priced to circulate. Every option is delivered instantly and backed by analyst support.
every brief